Tendering process of Dewan Ibnu Al-Khatib UiTM Perak – upgrading work / Fathin Nur Amierah Razali
This report briefly described the methods involved before and during the quotation or tender evaluation process is being conducted, as well as the result of recommended contractor also had been mentioned in this report. It is made based on five months experience at Development and Asset Management O...
Saved in:
Main Author: | Razali, Fathin Nur Amierah |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/44202/1/44202.pdf http://ir.uitm.edu.my/id/eprint/44202/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Preparation of tender document / Wan Abdullah
by: Abdullah, Wan
Published: (2016) -
Contract implementation for public works / Nur Azean Abdul Rahim
by: Abdul Rahim, Nur Azean
Published: (2016) -
Defectiveness in tender document / Muhammad Alif Syahmi Ahmad Fauzi and Kharizam Ismail
by: Ahmad Fauzi, Muhammad Alif Syahmi, et al.
Published: (2019) -
Appraising the need to study on the format of bills of quantities / Shamsulhadi Bandi, Hamimah Adnan and Fadhlin Abdullah
by: Bandi, Shamsulhadi, et al.
Published: (2016) -
Criteria for selecting nominated subcontractors in commersial building construction / Muhandiramge Nimashi Navodana Rodrigo and Balasooriya Arachige Kanchana Shiromi Perera
by: Muhandiramge, Nimashi Navodana Rodrigo, et al.
Published: (2017)