Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif
According to Environmental Quality Act 1974 (Act 127), under Section No. 34 (A), any developments that have significant impact to the environment are required to conduct the Environmental Impact Assessment (hereinafter called ‘EIA’). EIA is a study to identify, predict, evaluate and communicate info...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/44091/1/44091.pdf http://ir.uitm.edu.my/id/eprint/44091/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.44091 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.440912021-03-29T12:12:36Z http://ir.uitm.edu.my/id/eprint/44091/ Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif Mohd Arif, Adriana Environmental conditions. Environmental quality. Environmental indicators. Environmental degradation Environmental risk assessment Malaysia Environmental disasters Malaysia Enviromental management Malaysia Issues management According to Environmental Quality Act 1974 (Act 127), under Section No. 34 (A), any developments that have significant impact to the environment are required to conduct the Environmental Impact Assessment (hereinafter called ‘EIA’). EIA is a study to identify, predict, evaluate and communicate information about the impacts on the environment of a proposed project and to detail out the mitigating measures prior to project approval and implementation. During the EIA process, the Environmental Management Plan (hereinafter called ‘EMP’) is a part of EIA studies. The objective of EMP is to make sure the overall project comply with legislation, policy, guidelines and EIA approval conditions. It also provides support to the planning of environmental management of the project, include resource allocation. EMP typically contains a detailed programme for execution of environmental works which is integrated with the overall project programme. This typically includes management of soil erosion, siltation, air, water pollution and hazardous substances. The benefits of EMP is with the management plan, it will increase in environmental awareness of all parties. It also increases in training opportunities. 2014 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/44091/1/44091.pdf Mohd Arif, Adriana (2014) Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif. [Student Project] |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Environmental conditions. Environmental quality. Environmental indicators. Environmental degradation Environmental risk assessment Malaysia Environmental disasters Malaysia Enviromental management Malaysia Issues management |
spellingShingle |
Environmental conditions. Environmental quality. Environmental indicators. Environmental degradation Environmental risk assessment Malaysia Environmental disasters Malaysia Enviromental management Malaysia Issues management Mohd Arif, Adriana Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif |
description |
According to Environmental Quality Act 1974 (Act 127), under Section No. 34 (A), any developments that have significant impact to the environment are required to conduct the Environmental Impact Assessment (hereinafter called ‘EIA’). EIA is a study to identify, predict, evaluate and communicate information about the impacts on the environment of a proposed project and to detail out the mitigating measures prior to project approval and implementation. During the EIA process, the Environmental Management Plan (hereinafter called ‘EMP’) is a part of EIA studies. The objective of EMP is to make sure the overall project comply with legislation, policy, guidelines and EIA approval conditions. It also provides support to the planning of environmental management of the project, include resource allocation. EMP typically contains a detailed programme for execution of environmental works which is integrated with the overall project programme. This typically includes management of soil erosion, siltation, air, water pollution and hazardous substances. The benefits of EMP is with the management plan, it will increase in environmental awareness of all parties. It also increases in training opportunities. |
format |
Student Project |
author |
Mohd Arif, Adriana |
author_facet |
Mohd Arif, Adriana |
author_sort |
Mohd Arif, Adriana |
title |
Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif |
title_short |
Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif |
title_full |
Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif |
title_fullStr |
Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif |
title_full_unstemmed |
Case study on Environmental Management Plan (EMP) / Adriana Mohd Arif |
title_sort |
case study on environmental management plan (emp) / adriana mohd arif |
publishDate |
2014 |
url |
http://ir.uitm.edu.my/id/eprint/44091/1/44091.pdf http://ir.uitm.edu.my/id/eprint/44091/ |
_version_ |
1696979087370747904 |
score |
13.214268 |