Air-conditioning system at Gleneagles Kota Kinabalu / Nurul Shafa Nazihah Donny Asmy

Practical Training Report (BSR360) is the most important report that should be prepared by the final semester students of AP119 program. This report is about the experiences in Gleneagles Kota Kinabalu. It is prepared based on all sense and my experience that I gained for 4 month during the practica...

Full description

Saved in:
Bibliographic Details
Main Author: Donny Asmy, Nurul Shafa Nazihah
Format: Student Project
Language:English
Published: 2018
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/43386/1/43386.pdf
http://ir.uitm.edu.my/id/eprint/43386/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Practical Training Report (BSR360) is the most important report that should be prepared by the final semester students of AP119 program. This report is about the experiences in Gleneagles Kota Kinabalu. It is prepared based on all sense and my experience that I gained for 4 month during the practical training in the company. This report was divided into several section which one of the points will explain about the building background of the case study, Gleneagles Kota Kinabalu. Also, the main points of this report are elaborating about the operation, maintenance, problem and the recommendation of Air-Conditioning System. The practical training that I have been through for 4 month is Gleneagles Kota Kinabalu is very useful for me. With this report, I could understand the problem occurrence and identified it relation with the criteria design of this system in this building.