The life cycle cost for generator set / Khairul Ariffin Mat Zain

Generator is important aspect in ensuring efficiency level of any building. Currently, there are many existing building that fully utilized generator set as source of energy. Even Malaysia as a country, which has corporatized Lembaga Elektrik Negara (LLN) to Tenaga Nasional Berhad (TNB) because of t...

Full description

Saved in:
Bibliographic Details
Main Author: Mat Zai, Khairul Ariffin
Format: Thesis
Language:English
Published: 2003
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/41343/1/41343.pdf
https://ir.uitm.edu.my/id/eprint/41343/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.41343
record_format eprints
spelling my.uitm.ir.413432022-09-30T08:09:59Z https://ir.uitm.edu.my/id/eprint/41343/ The life cycle cost for generator set / Khairul Ariffin Mat Zain Mat Zai, Khairul Ariffin Construction equipment in building Generator is important aspect in ensuring efficiency level of any building. Currently, there are many existing building that fully utilized generator set as source of energy. Even Malaysia as a country, which has corporatized Lembaga Elektrik Negara (LLN) to Tenaga Nasional Berhad (TNB) because of they have realize the potential of electricity needs for the nation growth. Besides, Malaysia has once been shocked by Nation’s 1997 blackout. Generator set is generating electricity in standby situation for building. In narrower scope, the importance of generator set is much alike the TNB sub-station with exception that the generator set only provided the electricity energy recovery during power interruption or during sub-station maintenance. Therefore, the main objective of this dissertation is to evaluate the case study in aspect of the life cycle cost: ,the cost of maintenance and testing per generator set, the manpower use in maintenance and testing per generator set, time spent for maintenance and testing per generator set. Aside from that, the secondary objective also carried together in this research with data collection from the sample generator set on these matters, to study about privatization in Malaysia especially for hospital maintenance management. To study of generator set start from power part and its operation. 2003 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/41343/1/41343.pdf The life cycle cost for generator set / Khairul Ariffin Mat Zain. (2003) Degree thesis, thesis, Universiti Teknologi MARA.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Construction equipment in building
spellingShingle Construction equipment in building
Mat Zai, Khairul Ariffin
The life cycle cost for generator set / Khairul Ariffin Mat Zain
description Generator is important aspect in ensuring efficiency level of any building. Currently, there are many existing building that fully utilized generator set as source of energy. Even Malaysia as a country, which has corporatized Lembaga Elektrik Negara (LLN) to Tenaga Nasional Berhad (TNB) because of they have realize the potential of electricity needs for the nation growth. Besides, Malaysia has once been shocked by Nation’s 1997 blackout. Generator set is generating electricity in standby situation for building. In narrower scope, the importance of generator set is much alike the TNB sub-station with exception that the generator set only provided the electricity energy recovery during power interruption or during sub-station maintenance. Therefore, the main objective of this dissertation is to evaluate the case study in aspect of the life cycle cost: ,the cost of maintenance and testing per generator set, the manpower use in maintenance and testing per generator set, time spent for maintenance and testing per generator set. Aside from that, the secondary objective also carried together in this research with data collection from the sample generator set on these matters, to study about privatization in Malaysia especially for hospital maintenance management. To study of generator set start from power part and its operation.
format Thesis
author Mat Zai, Khairul Ariffin
author_facet Mat Zai, Khairul Ariffin
author_sort Mat Zai, Khairul Ariffin
title The life cycle cost for generator set / Khairul Ariffin Mat Zain
title_short The life cycle cost for generator set / Khairul Ariffin Mat Zain
title_full The life cycle cost for generator set / Khairul Ariffin Mat Zain
title_fullStr The life cycle cost for generator set / Khairul Ariffin Mat Zain
title_full_unstemmed The life cycle cost for generator set / Khairul Ariffin Mat Zain
title_sort life cycle cost for generator set / khairul ariffin mat zain
publishDate 2003
url https://ir.uitm.edu.my/id/eprint/41343/1/41343.pdf
https://ir.uitm.edu.my/id/eprint/41343/
_version_ 1746213065859268608
score 13.160551