Dynamic flood inundation model - a case study at Damansara catchment / Awang Nasrizal Awang Ali

Damansara Catchment is flood prone and major problem for the dense populated region is the damages received during flood. High intensity rainfall of 104 mm/day on 26th February 2006 had affected several areas to be heavily inundated with losses up to RM 45 millions. Thus, there is a need to conduct...

Full description

Saved in:
Bibliographic Details
Main Author: Awang Ali, Awang Nasrizal
Format: Thesis
Language:English
Published: 2011
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/39477/1/39477.pdf
https://ir.uitm.edu.my/id/eprint/39477/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.39477
record_format eprints
spelling my.uitm.ir.394772022-09-26T03:46:19Z https://ir.uitm.edu.my/id/eprint/39477/ Dynamic flood inundation model - a case study at Damansara catchment / Awang Nasrizal Awang Ali Awang Ali, Awang Nasrizal Rivers. Stream measurements River protective works. Regulation. Flood control Damansara Catchment is flood prone and major problem for the dense populated region is the damages received during flood. High intensity rainfall of 104 mm/day on 26th February 2006 had affected several areas to be heavily inundated with losses up to RM 45 millions. Thus, there is a need to conduct a study. This project presents a 3D (three-dimensional) hydrodynamic flood simulation that utilizes GIS (Geographic Information Systems). A DEM (Digital Elevation Model) for Damansara Catchment was developed and integrated into InfoWorks River Simulation (IWRS) program. The model was calibrated and validated using the 26th February 2006, 21st March 2007 and 15th October 2008 flood event. The parameters involved in calibration are the CN (Curve Number), Manning's Roughness Coefficient («) and River Profiles Extension. In model reliability analysis, the ratio of Linear Regression, R2 was found to be hard to be calibrated, probably due to changes in river profiles. MWLA (Maximum Water Level Analysis) and RMSE (Root Mean Square Error) both show error less than 9.09% and 0.90% respectively, and in Chi-Square Test, p>0.90, thus indicating that the difference between actual and simulated water level is not significant and that the model is satisfactory. Inundated areas such as TTDI Jaya are able to be identified from inundation map. An alternative natural retention pond, RPOOl is proposed at the upper catchment of Kampung Melayu Subang through the utilization of existing terrain 'bowl'. With improvement on the catchments' soil cover, RPOOl pond was simulated to be able to reduce both flood level and volume up to 2.90% and 4.10% respectively. 2011 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/39477/1/39477.pdf Dynamic flood inundation model - a case study at Damansara catchment / Awang Nasrizal Awang Ali. (2011) Masters thesis, thesis, Universiti Teknologi MARA (UiTM).
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Rivers. Stream measurements
River protective works. Regulation. Flood control
spellingShingle Rivers. Stream measurements
River protective works. Regulation. Flood control
Awang Ali, Awang Nasrizal
Dynamic flood inundation model - a case study at Damansara catchment / Awang Nasrizal Awang Ali
description Damansara Catchment is flood prone and major problem for the dense populated region is the damages received during flood. High intensity rainfall of 104 mm/day on 26th February 2006 had affected several areas to be heavily inundated with losses up to RM 45 millions. Thus, there is a need to conduct a study. This project presents a 3D (three-dimensional) hydrodynamic flood simulation that utilizes GIS (Geographic Information Systems). A DEM (Digital Elevation Model) for Damansara Catchment was developed and integrated into InfoWorks River Simulation (IWRS) program. The model was calibrated and validated using the 26th February 2006, 21st March 2007 and 15th October 2008 flood event. The parameters involved in calibration are the CN (Curve Number), Manning's Roughness Coefficient («) and River Profiles Extension. In model reliability analysis, the ratio of Linear Regression, R2 was found to be hard to be calibrated, probably due to changes in river profiles. MWLA (Maximum Water Level Analysis) and RMSE (Root Mean Square Error) both show error less than 9.09% and 0.90% respectively, and in Chi-Square Test, p>0.90, thus indicating that the difference between actual and simulated water level is not significant and that the model is satisfactory. Inundated areas such as TTDI Jaya are able to be identified from inundation map. An alternative natural retention pond, RPOOl is proposed at the upper catchment of Kampung Melayu Subang through the utilization of existing terrain 'bowl'. With improvement on the catchments' soil cover, RPOOl pond was simulated to be able to reduce both flood level and volume up to 2.90% and 4.10% respectively.
format Thesis
author Awang Ali, Awang Nasrizal
author_facet Awang Ali, Awang Nasrizal
author_sort Awang Ali, Awang Nasrizal
title Dynamic flood inundation model - a case study at Damansara catchment / Awang Nasrizal Awang Ali
title_short Dynamic flood inundation model - a case study at Damansara catchment / Awang Nasrizal Awang Ali
title_full Dynamic flood inundation model - a case study at Damansara catchment / Awang Nasrizal Awang Ali
title_fullStr Dynamic flood inundation model - a case study at Damansara catchment / Awang Nasrizal Awang Ali
title_full_unstemmed Dynamic flood inundation model - a case study at Damansara catchment / Awang Nasrizal Awang Ali
title_sort dynamic flood inundation model - a case study at damansara catchment / awang nasrizal awang ali
publishDate 2011
url https://ir.uitm.edu.my/id/eprint/39477/1/39477.pdf
https://ir.uitm.edu.my/id/eprint/39477/
_version_ 1745565271260659712
score 13.15806