Construction court in Malaysia: a legal analysis / Farisha Husna Mat Darus...[et al.]

The reasoning behind this research is to study the effectiveness and efficiency of the Malaysian Construction Court, which is a new specialist court in the Malaysian legal landscape. As the Construction Court is still in its infancy, this research is carried out in order to provide information on...

Full description

Saved in:
Bibliographic Details
Main Authors: Mat Darus, Farisha Husna, Kamarudin, Nur Fatin Syakinah, Mazlan, Nurulhuda Najwa, Raja Zainal Abidin, Raja Syaza Farhanah
Format: Student Project
Language:English
Published: 2014
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/39180/1/39180.pdf
https://ir.uitm.edu.my/id/eprint/39180/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.39180
record_format eprints
spelling my.uitm.ir.391802022-07-05T07:51:33Z https://ir.uitm.edu.my/id/eprint/39180/ Construction court in Malaysia: a legal analysis / Farisha Husna Mat Darus...[et al.] Mat Darus, Farisha Husna Kamarudin, Nur Fatin Syakinah Mazlan, Nurulhuda Najwa Raja Zainal Abidin, Raja Syaza Farhanah Building laws The reasoning behind this research is to study the effectiveness and efficiency of the Malaysian Construction Court, which is a new specialist court in the Malaysian legal landscape. As the Construction Court is still in its infancy, this research is carried out in order to provide information on the Construction Court, where previously no information has been made available. Besides that, the research is also carried out in order to see if it is necessary to establish a Construction Court, and if the Construction Court has been effective. A qualitative approach is taken in doing the research. Interviews with the Construction Court judges and the General Manager of Business Division of the Construction Industrial Development Board had been conducted in order to gain relevant information. As the construction industry is increasingly developing, this research may be beneficial to those in the construction industry, and also to those with an interest in construction law. The focus of the research is on the effectiveness and efficiency of the Construction Court in order to determine whether the establishment of the Construction Court is necessary and warranted. An examination of the construction industry in Malaysia prior to the establishment of the Construction Court is made, whereby it was found that the construction industry had faced certain disadvantages which slowed its progression. The disadvantages include the lengthy time take to resolve disputes, inadequate relief, and the insufficiency of dispute resolution provided by civil courts and arbitration. This gave rise to the establishment of the Construction Court, which was the product of like-minded parties including the construction industry and the judiciary. The collaboration occurred in a bit to address the issues that are faced by the construction industry, which may affect adversely the Malaysian economy. Many cases have been filed at the Construction Court since its inception, which can be interpreted^ that there is a demand for a specialist Construction Court. According to the Construction Industry Development Board, out of the 205 cases filed in the Construction Court, 124 cases were disposed by June 2014, meaning that 60.5% of cases were disposed in the period of fifteen months. Based on the number of cases disposed, it can be said that the Construction Court is effective. 2014 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/39180/1/39180.pdf Construction court in Malaysia: a legal analysis / Farisha Husna Mat Darus...[et al.]. (2014) [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Building laws
spellingShingle Building laws
Mat Darus, Farisha Husna
Kamarudin, Nur Fatin Syakinah
Mazlan, Nurulhuda Najwa
Raja Zainal Abidin, Raja Syaza Farhanah
Construction court in Malaysia: a legal analysis / Farisha Husna Mat Darus...[et al.]
description The reasoning behind this research is to study the effectiveness and efficiency of the Malaysian Construction Court, which is a new specialist court in the Malaysian legal landscape. As the Construction Court is still in its infancy, this research is carried out in order to provide information on the Construction Court, where previously no information has been made available. Besides that, the research is also carried out in order to see if it is necessary to establish a Construction Court, and if the Construction Court has been effective. A qualitative approach is taken in doing the research. Interviews with the Construction Court judges and the General Manager of Business Division of the Construction Industrial Development Board had been conducted in order to gain relevant information. As the construction industry is increasingly developing, this research may be beneficial to those in the construction industry, and also to those with an interest in construction law. The focus of the research is on the effectiveness and efficiency of the Construction Court in order to determine whether the establishment of the Construction Court is necessary and warranted. An examination of the construction industry in Malaysia prior to the establishment of the Construction Court is made, whereby it was found that the construction industry had faced certain disadvantages which slowed its progression. The disadvantages include the lengthy time take to resolve disputes, inadequate relief, and the insufficiency of dispute resolution provided by civil courts and arbitration. This gave rise to the establishment of the Construction Court, which was the product of like-minded parties including the construction industry and the judiciary. The collaboration occurred in a bit to address the issues that are faced by the construction industry, which may affect adversely the Malaysian economy. Many cases have been filed at the Construction Court since its inception, which can be interpreted^ that there is a demand for a specialist Construction Court. According to the Construction Industry Development Board, out of the 205 cases filed in the Construction Court, 124 cases were disposed by June 2014, meaning that 60.5% of cases were disposed in the period of fifteen months. Based on the number of cases disposed, it can be said that the Construction Court is effective.
format Student Project
author Mat Darus, Farisha Husna
Kamarudin, Nur Fatin Syakinah
Mazlan, Nurulhuda Najwa
Raja Zainal Abidin, Raja Syaza Farhanah
author_facet Mat Darus, Farisha Husna
Kamarudin, Nur Fatin Syakinah
Mazlan, Nurulhuda Najwa
Raja Zainal Abidin, Raja Syaza Farhanah
author_sort Mat Darus, Farisha Husna
title Construction court in Malaysia: a legal analysis / Farisha Husna Mat Darus...[et al.]
title_short Construction court in Malaysia: a legal analysis / Farisha Husna Mat Darus...[et al.]
title_full Construction court in Malaysia: a legal analysis / Farisha Husna Mat Darus...[et al.]
title_fullStr Construction court in Malaysia: a legal analysis / Farisha Husna Mat Darus...[et al.]
title_full_unstemmed Construction court in Malaysia: a legal analysis / Farisha Husna Mat Darus...[et al.]
title_sort construction court in malaysia: a legal analysis / farisha husna mat darus...[et al.]
publishDate 2014
url https://ir.uitm.edu.my/id/eprint/39180/1/39180.pdf
https://ir.uitm.edu.my/id/eprint/39180/
_version_ 1738513885127770112
score 13.18916