A study on handling equipments operation and performance at Port Klang-KPCT Sdn Bhd / Azahari Ramli

In year 2010, Port Klang is expected to serve as a hub port or load centre for all cargo entering, leaving and transiting the Straits of Malacca area. Klang Port Container Terminal ( KPCT ) Sdn Bhid should be well prepared in term of handling facilities in order to face the challenge in the futur...

Full description

Saved in:
Bibliographic Details
Main Author: Ramli, Azahari
Format: Thesis
Language:English
Published: 1996
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/39165/1/39165.pdf
https://ir.uitm.edu.my/id/eprint/39165/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.39165
record_format eprints
spelling my.uitm.ir.391652022-07-05T07:50:02Z https://ir.uitm.edu.my/id/eprint/39165/ A study on handling equipments operation and performance at Port Klang-KPCT Sdn Bhd / Azahari Ramli Ramli, Azahari Industrial engineering. Management engineering Machine design and drawing Machine construction (General) In year 2010, Port Klang is expected to serve as a hub port or load centre for all cargo entering, leaving and transiting the Straits of Malacca area. Klang Port Container Terminal ( KPCT ) Sdn Bhid should be well prepared in term of handling facilities in order to face the challenge in the future. The numbers of handling equipments are not just determined the level of throughput but the level of service guarantee by the port operator. The performance and operation of the handling facilities must in position in meeting client's requirements. The purpose of the study is to determine whether the present operation and performance of handling equipments can cope the demand in the future. Whether the present numbers of handling equipments available are sufficient to cater the demands. The study proved that the current operation and performance of the handling equipments are not sufficient to meet the demand in the future and the present number of the handling machine only adequate in meeting today requirement. Solution to the problem will be presented at the end of the chapter. It is essential to present adequate facilities with appropriate method of operation and efficient performance in meeting the challenge. 1996 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/39165/1/39165.pdf A study on handling equipments operation and performance at Port Klang-KPCT Sdn Bhd / Azahari Ramli. (1996) Degree thesis, thesis, Universiti Teknologi MARA.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Industrial engineering. Management engineering
Machine design and drawing
Machine construction (General)
spellingShingle Industrial engineering. Management engineering
Machine design and drawing
Machine construction (General)
Ramli, Azahari
A study on handling equipments operation and performance at Port Klang-KPCT Sdn Bhd / Azahari Ramli
description In year 2010, Port Klang is expected to serve as a hub port or load centre for all cargo entering, leaving and transiting the Straits of Malacca area. Klang Port Container Terminal ( KPCT ) Sdn Bhid should be well prepared in term of handling facilities in order to face the challenge in the future. The numbers of handling equipments are not just determined the level of throughput but the level of service guarantee by the port operator. The performance and operation of the handling facilities must in position in meeting client's requirements. The purpose of the study is to determine whether the present operation and performance of handling equipments can cope the demand in the future. Whether the present numbers of handling equipments available are sufficient to cater the demands. The study proved that the current operation and performance of the handling equipments are not sufficient to meet the demand in the future and the present number of the handling machine only adequate in meeting today requirement. Solution to the problem will be presented at the end of the chapter. It is essential to present adequate facilities with appropriate method of operation and efficient performance in meeting the challenge.
format Thesis
author Ramli, Azahari
author_facet Ramli, Azahari
author_sort Ramli, Azahari
title A study on handling equipments operation and performance at Port Klang-KPCT Sdn Bhd / Azahari Ramli
title_short A study on handling equipments operation and performance at Port Klang-KPCT Sdn Bhd / Azahari Ramli
title_full A study on handling equipments operation and performance at Port Klang-KPCT Sdn Bhd / Azahari Ramli
title_fullStr A study on handling equipments operation and performance at Port Klang-KPCT Sdn Bhd / Azahari Ramli
title_full_unstemmed A study on handling equipments operation and performance at Port Klang-KPCT Sdn Bhd / Azahari Ramli
title_sort study on handling equipments operation and performance at port klang-kpct sdn bhd / azahari ramli
publishDate 1996
url https://ir.uitm.edu.my/id/eprint/39165/1/39165.pdf
https://ir.uitm.edu.my/id/eprint/39165/
_version_ 1738513884732456960
score 13.214268