Bid evaluation strategy among G7 construction companies in Sarawak / Ika Syafiqa Abdullah

ln construction industry, which is risky and have a great chance of losing money or gaining profit in a greater amount, there will always challenges in completing even a project itself. Construction bidding is a very compulsory process in the construction industry as allocation of contract and deter...

Full description

Saved in:
Bibliographic Details
Main Author: Abdullah, Ika Syafiqa
Format: Thesis
Language:English
Published: 2020
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/36729/1/36729.pdf
https://ir.uitm.edu.my/id/eprint/36729/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.36729
record_format eprints
spelling my.uitm.ir.367292021-11-22T02:40:40Z https://ir.uitm.edu.my/id/eprint/36729/ Bid evaluation strategy among G7 construction companies in Sarawak / Ika Syafiqa Abdullah Abdullah, Ika Syafiqa Data processing. Including SPSS Construction industry ln construction industry, which is risky and have a great chance of losing money or gaining profit in a greater amount, there will always challenges in completing even a project itself. Construction bidding is a very compulsory process in the construction industry as allocation of contract and determination of construction services price is through some form of competitive bidding. The process is very risky and required a lot of time in decision-making as there are another factor need to be considered. Evaluation of bid is done technically, and various method are used for the financial evaluation which comprises differ methods. The objectives of this research are to identify the strategy that is used by the G7 construction companies in bid evaluation, to investigate the challenges in order to strive that strategy and to analyze the factor contributing to the effectiveness of the strategy. ln order to obtain the data, quantitative data is used as all the data gathered will be quantify and focusing on certain population. The research is to be carried based on result from questionnaire distributed to G7 contractor's company and from the information gathered by reviewing and abstracting information from literature review of various sources. The questionnaire will be distributed to 40 respondents which is G7 contractor in Sarawak. Statistical Package for the Social Sciences (SPSS) Software will be used for the data analysis of the results from the questionnaire distributed. As for the type of data analysis, frequency, multiple response, crosstab and descriptive analysis. From the findings, researcher find that most of the contractor in G7 construction companies in Sarawak chose reputation for safety, quality and speedy construction as the most effective strategy to win the bid and is supported by the fact that quality management is very vital. The significant in this study is to give more information and improvement of current study to be used in the future. As for future recommendation, a similar study on the different class of contractor could be conducted to determine either the strategy is used by them. 2020-06 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/36729/1/36729.pdf ID36729 Abdullah, Ika Syafiqa (2020) Bid evaluation strategy among G7 construction companies in Sarawak / Ika Syafiqa Abdullah. Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Data processing. Including SPSS
Construction industry
spellingShingle Data processing. Including SPSS
Construction industry
Abdullah, Ika Syafiqa
Bid evaluation strategy among G7 construction companies in Sarawak / Ika Syafiqa Abdullah
description ln construction industry, which is risky and have a great chance of losing money or gaining profit in a greater amount, there will always challenges in completing even a project itself. Construction bidding is a very compulsory process in the construction industry as allocation of contract and determination of construction services price is through some form of competitive bidding. The process is very risky and required a lot of time in decision-making as there are another factor need to be considered. Evaluation of bid is done technically, and various method are used for the financial evaluation which comprises differ methods. The objectives of this research are to identify the strategy that is used by the G7 construction companies in bid evaluation, to investigate the challenges in order to strive that strategy and to analyze the factor contributing to the effectiveness of the strategy. ln order to obtain the data, quantitative data is used as all the data gathered will be quantify and focusing on certain population. The research is to be carried based on result from questionnaire distributed to G7 contractor's company and from the information gathered by reviewing and abstracting information from literature review of various sources. The questionnaire will be distributed to 40 respondents which is G7 contractor in Sarawak. Statistical Package for the Social Sciences (SPSS) Software will be used for the data analysis of the results from the questionnaire distributed. As for the type of data analysis, frequency, multiple response, crosstab and descriptive analysis. From the findings, researcher find that most of the contractor in G7 construction companies in Sarawak chose reputation for safety, quality and speedy construction as the most effective strategy to win the bid and is supported by the fact that quality management is very vital. The significant in this study is to give more information and improvement of current study to be used in the future. As for future recommendation, a similar study on the different class of contractor could be conducted to determine either the strategy is used by them.
format Thesis
author Abdullah, Ika Syafiqa
author_facet Abdullah, Ika Syafiqa
author_sort Abdullah, Ika Syafiqa
title Bid evaluation strategy among G7 construction companies in Sarawak / Ika Syafiqa Abdullah
title_short Bid evaluation strategy among G7 construction companies in Sarawak / Ika Syafiqa Abdullah
title_full Bid evaluation strategy among G7 construction companies in Sarawak / Ika Syafiqa Abdullah
title_fullStr Bid evaluation strategy among G7 construction companies in Sarawak / Ika Syafiqa Abdullah
title_full_unstemmed Bid evaluation strategy among G7 construction companies in Sarawak / Ika Syafiqa Abdullah
title_sort bid evaluation strategy among g7 construction companies in sarawak / ika syafiqa abdullah
publishDate 2020
url https://ir.uitm.edu.my/id/eprint/36729/1/36729.pdf
https://ir.uitm.edu.my/id/eprint/36729/
_version_ 1717097257504866304
score 13.160551