Comparison between the estimated and actual productivity for the fabrication of a steel framework / Mohd Zukarnan Mat Deraseh

A manufacturing company has the need to improve productivity in fabrication. The improvement in production technology will not effectively increase productivity unless the efficiency in material handling, preparation, assembly, application of tooling and welding deposition is optimized. To improving...

Full description

Saved in:
Bibliographic Details
Main Author: Mat Deraseh, Mohd Zukarnan
Format: Thesis
Language:English
Published: 2010
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/35788/1/35788.pdf
http://ir.uitm.edu.my/id/eprint/35788/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.35788
record_format eprints
spelling my.uitm.ir.357882020-10-28T01:20:54Z http://ir.uitm.edu.my/id/eprint/35788/ Comparison between the estimated and actual productivity for the fabrication of a steel framework / Mohd Zukarnan Mat Deraseh Mat Deraseh, Mohd Zukarnan Machine shops and machine shop practice Manufacturing processes. Lean manufacturing Metal manufactures. Metalworking A manufacturing company has the need to improve productivity in fabrication. The improvement in production technology will not effectively increase productivity unless the efficiency in material handling, preparation, assembly, application of tooling and welding deposition is optimized. To improving the productivity, Work Study analysis was applied, incorporating Method Study and Work Measurement to determine the critical path, to optimize the assembly line and to eliminate activities that reduce the productivity. The study began by selection one of the process line (fabrication of structure frame), video of the entire process or activities such as design of the structure frame with Catia software(structure details, gusset details, welding details, bolting details)welding training, structure members(search material, handling material, measurement of material preparation of cutting process, replace material, drilling), gusset plate(search, handling, cutting, replace, drilling material), assembly(assembly the fixture, assembly the structure members, assembly the gusset plate, tack welding/bolting) and welding(preparation of welding machine, preparation of frame before welding, NDT testing, inspecting of welding) was recorded and data were analyzed in Microsoft project software. Through replay of the video, the duration of every operation step in every work station can be measured. Based on the production flow, a new flow chart was developed in Microsoft Project software, a planned project schedule or new flow chart will then be compared to actual fabrication performance. 2010 Thesis NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/35788/1/35788.pdf Mat Deraseh, Mohd Zukarnan (2010) Comparison between the estimated and actual productivity for the fabrication of a steel framework / Mohd Zukarnan Mat Deraseh. Degree thesis, Universiti Teknologi MARA.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Machine shops and machine shop practice
Manufacturing processes. Lean manufacturing
Metal manufactures. Metalworking
spellingShingle Machine shops and machine shop practice
Manufacturing processes. Lean manufacturing
Metal manufactures. Metalworking
Mat Deraseh, Mohd Zukarnan
Comparison between the estimated and actual productivity for the fabrication of a steel framework / Mohd Zukarnan Mat Deraseh
description A manufacturing company has the need to improve productivity in fabrication. The improvement in production technology will not effectively increase productivity unless the efficiency in material handling, preparation, assembly, application of tooling and welding deposition is optimized. To improving the productivity, Work Study analysis was applied, incorporating Method Study and Work Measurement to determine the critical path, to optimize the assembly line and to eliminate activities that reduce the productivity. The study began by selection one of the process line (fabrication of structure frame), video of the entire process or activities such as design of the structure frame with Catia software(structure details, gusset details, welding details, bolting details)welding training, structure members(search material, handling material, measurement of material preparation of cutting process, replace material, drilling), gusset plate(search, handling, cutting, replace, drilling material), assembly(assembly the fixture, assembly the structure members, assembly the gusset plate, tack welding/bolting) and welding(preparation of welding machine, preparation of frame before welding, NDT testing, inspecting of welding) was recorded and data were analyzed in Microsoft project software. Through replay of the video, the duration of every operation step in every work station can be measured. Based on the production flow, a new flow chart was developed in Microsoft Project software, a planned project schedule or new flow chart will then be compared to actual fabrication performance.
format Thesis
author Mat Deraseh, Mohd Zukarnan
author_facet Mat Deraseh, Mohd Zukarnan
author_sort Mat Deraseh, Mohd Zukarnan
title Comparison between the estimated and actual productivity for the fabrication of a steel framework / Mohd Zukarnan Mat Deraseh
title_short Comparison between the estimated and actual productivity for the fabrication of a steel framework / Mohd Zukarnan Mat Deraseh
title_full Comparison between the estimated and actual productivity for the fabrication of a steel framework / Mohd Zukarnan Mat Deraseh
title_fullStr Comparison between the estimated and actual productivity for the fabrication of a steel framework / Mohd Zukarnan Mat Deraseh
title_full_unstemmed Comparison between the estimated and actual productivity for the fabrication of a steel framework / Mohd Zukarnan Mat Deraseh
title_sort comparison between the estimated and actual productivity for the fabrication of a steel framework / mohd zukarnan mat deraseh
publishDate 2010
url http://ir.uitm.edu.my/id/eprint/35788/1/35788.pdf
http://ir.uitm.edu.my/id/eprint/35788/
_version_ 1685651328457506816
score 13.160551