Improving layout and workload of manufacturing system in small and medium enterprise (SME) using Delmia Quest / Alifah Alyana Azhari

A facility layout can be defined as an arrangement of the equipment area in the industry or organization of the factory. The main objective of this project is to improve the existing layout in SMEs using DELMIA QUEST simulation. In this project, new layouts are proposed to reduce the waiting time in...

Full description

Saved in:
Bibliographic Details
Main Author: Azhari, Alifah Alyana
Format: Student Project
Language:English
Published: 2017
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/35032/1/35032.pdf
http://ir.uitm.edu.my/id/eprint/35032/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.35032
record_format eprints
spelling my.uitm.ir.350322020-10-12T03:17:12Z http://ir.uitm.edu.my/id/eprint/35032/ Improving layout and workload of manufacturing system in small and medium enterprise (SME) using Delmia Quest / Alifah Alyana Azhari Azhari, Alifah Alyana Production management. Operations management Product engineering Product design. Industrial design Malaysia Manufacturing processes. Lean manufacturing A facility layout can be defined as an arrangement of the equipment area in the industry or organization of the factory. The main objective of this project is to improve the existing layout in SMEs using DELMIA QUEST simulation. In this project, new layouts are proposed to reduce the waiting time in a production line and increased the productivity. This study focused on packaging production line in Syarikat Hang Tuah Sdn Bhd, a Coffee Manufacturing company located at Tasek Gelugor Pulau Pinang. The problems identified in these production lines are the small working space, some process overlaps and bottleneck due to high demands of the product. These resulted in high lead time. The existing layout was studied and simulated to improve certain parameters such as labour, machines, shape and space of the layout. The workstations for Sifting, Sachet Packaging, Small Packaging, Big Packaging, Boxing and Finishing Good processes are repositioned in the proposed layout before undergoing simulation process using DELMIA QUEST software. From the simulation results, the significant improvement is determined and the best layout chosen in term of machines utilization and total output. Based on this, a new layout is proposed to increase the productivity capacity and to meet customer demand. Simulation data of the proposed layout shows its productivity has increased to approximately 41.5%. 2017-01 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/35032/1/35032.pdf Azhari, Alifah Alyana (2017) Improving layout and workload of manufacturing system in small and medium enterprise (SME) using Delmia Quest / Alifah Alyana Azhari. [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Production management. Operations management
Product engineering
Product design. Industrial design
Malaysia
Manufacturing processes. Lean manufacturing
spellingShingle Production management. Operations management
Product engineering
Product design. Industrial design
Malaysia
Manufacturing processes. Lean manufacturing
Azhari, Alifah Alyana
Improving layout and workload of manufacturing system in small and medium enterprise (SME) using Delmia Quest / Alifah Alyana Azhari
description A facility layout can be defined as an arrangement of the equipment area in the industry or organization of the factory. The main objective of this project is to improve the existing layout in SMEs using DELMIA QUEST simulation. In this project, new layouts are proposed to reduce the waiting time in a production line and increased the productivity. This study focused on packaging production line in Syarikat Hang Tuah Sdn Bhd, a Coffee Manufacturing company located at Tasek Gelugor Pulau Pinang. The problems identified in these production lines are the small working space, some process overlaps and bottleneck due to high demands of the product. These resulted in high lead time. The existing layout was studied and simulated to improve certain parameters such as labour, machines, shape and space of the layout. The workstations for Sifting, Sachet Packaging, Small Packaging, Big Packaging, Boxing and Finishing Good processes are repositioned in the proposed layout before undergoing simulation process using DELMIA QUEST software. From the simulation results, the significant improvement is determined and the best layout chosen in term of machines utilization and total output. Based on this, a new layout is proposed to increase the productivity capacity and to meet customer demand. Simulation data of the proposed layout shows its productivity has increased to approximately 41.5%.
format Student Project
author Azhari, Alifah Alyana
author_facet Azhari, Alifah Alyana
author_sort Azhari, Alifah Alyana
title Improving layout and workload of manufacturing system in small and medium enterprise (SME) using Delmia Quest / Alifah Alyana Azhari
title_short Improving layout and workload of manufacturing system in small and medium enterprise (SME) using Delmia Quest / Alifah Alyana Azhari
title_full Improving layout and workload of manufacturing system in small and medium enterprise (SME) using Delmia Quest / Alifah Alyana Azhari
title_fullStr Improving layout and workload of manufacturing system in small and medium enterprise (SME) using Delmia Quest / Alifah Alyana Azhari
title_full_unstemmed Improving layout and workload of manufacturing system in small and medium enterprise (SME) using Delmia Quest / Alifah Alyana Azhari
title_sort improving layout and workload of manufacturing system in small and medium enterprise (sme) using delmia quest / alifah alyana azhari
publishDate 2017
url http://ir.uitm.edu.my/id/eprint/35032/1/35032.pdf
http://ir.uitm.edu.my/id/eprint/35032/
_version_ 1685651257685966848
score 13.211869