Menara Kerja Raya (MKR) / Qyu Ray Joseph Suleiman ... [et al.]

The ‘Menara Kerja Raya’ are located at Jalan Sultan Salahuddin, 50580 Kuala Lumpur with total of 37 floor level. It is a cooperate office which served as the headquarter of the Ministry of works of Malaysia. The tower were built starting from 1st December 2009 and completed on 28th March 2012 with v...

Full description

Saved in:
Bibliographic Details
Main Authors: Qyu Ray, Joseph Suleiman, Syed Muhamad Shafuan, Syed Zol Kanain, Faten Nur Ezzatie, Baharin, Nur Najwa, Noran
Format: Student Project
Language:English
Published: 2019
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/34057/1/34057.pdf
http://ir.uitm.edu.my/id/eprint/34057/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.34057
record_format eprints
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Maintenance and repair
Management of the construction site. Superintendence of building construction
Building inspection
spellingShingle Maintenance and repair
Management of the construction site. Superintendence of building construction
Building inspection
Qyu Ray, Joseph Suleiman
Syed Muhamad Shafuan, Syed Zol Kanain
Faten Nur Ezzatie, Baharin
Nur Najwa, Noran
Menara Kerja Raya (MKR) / Qyu Ray Joseph Suleiman ... [et al.]
description The ‘Menara Kerja Raya’ are located at Jalan Sultan Salahuddin, 50580 Kuala Lumpur with total of 37 floor level. It is a cooperate office which served as the headquarter of the Ministry of works of Malaysia. The tower were built starting from 1st December 2009 and completed on 28th March 2012 with various parties involve during process of completing the tower such as the GDP Architect, ARUP consultant, Metropolis design consultant, IEN consultant and ZETTA consultant. With the total RM 309,374,000.00 as the built up cost, the tower were built up to 168m in height provided with GFA of 52 271 square metre. Facilities provided within the MKR consisted from Surau and cafe at level 3 while there is pantry at every floor level at the office area. The company in charge for maintaining the tower is the KCJ engineering company whereas they first operate at the property in November 2016 and each systems of the building such as Building management system, elevator, landscaping and cleaning are handled by an out-source company with contract. Maintenance programme were prepared to carry out it’s maintenance work for each of the system especially in cold water supply, fire fighting, GBI component, BMS, plant system as well as electrical system. The concept of the MKR is the diamond glass which the tower are installed high performance envelope which is meant to reduce heat transfer. MKR is a certified green building index with the rating of platinum equipped with GBI components consisted of rain water harvesting, grey water recycling, solar panel, intelligent lighting control, and building management system. The other factors that contributed to the rating of the MKR are the sustainable material used, site planning and management, waste management, recycle material and others but the highest assessment that contributed to the GBI rating is the Energy efficiency(EE) with total point of 35 out of 90. The Building Management system are installed at the MKR with purpose of monitoring and controlling the lighting control, fire protection, lift and MSB system. In buiding condition assessment, inspection does cover entirely on the building because of limitation on access of every floor. There are total of 21 defect found during the inspection and rating of the building based on the defect recorded does not represent entirely and need to be justify. The type of defect found consisted of mould growth, crack, stain mark, peeling of paint, rusting, and missing. On the maintenance planning, there are systems involved in short, medium and long term based on the maintenance programme provided access for maintenance are either at normal office hour and direct maintenance work which is the emergency repair for example leaking of pipe at the Male toilet. The only tenant in MKR is at the cafe where there are cafe B and A, each cafe are provided with three lot. In terms of contract service, the Hitachi elevator are under comprehensive maintenance where the 16 lift installed at the tower are fully maintained by the service provider with monthly payment according to the contract agreed from both parties. With inspection carried out and supported with photos, all the clauses according to each of the law does comply with the MKR. The only income generated from the MKR are the rent needed to be paid each month. In maintenance management, cash flow for maintenance were tabulated in an according form to show the income and expenditure of maintenance. Forecast are then projected to 3 years ahead starting from 2019 until 2021.
format Student Project
author Qyu Ray, Joseph Suleiman
Syed Muhamad Shafuan, Syed Zol Kanain
Faten Nur Ezzatie, Baharin
Nur Najwa, Noran
author_facet Qyu Ray, Joseph Suleiman
Syed Muhamad Shafuan, Syed Zol Kanain
Faten Nur Ezzatie, Baharin
Nur Najwa, Noran
author_sort Qyu Ray, Joseph Suleiman
title Menara Kerja Raya (MKR) / Qyu Ray Joseph Suleiman ... [et al.]
title_short Menara Kerja Raya (MKR) / Qyu Ray Joseph Suleiman ... [et al.]
title_full Menara Kerja Raya (MKR) / Qyu Ray Joseph Suleiman ... [et al.]
title_fullStr Menara Kerja Raya (MKR) / Qyu Ray Joseph Suleiman ... [et al.]
title_full_unstemmed Menara Kerja Raya (MKR) / Qyu Ray Joseph Suleiman ... [et al.]
title_sort menara kerja raya (mkr) / qyu ray joseph suleiman ... [et al.]
publishDate 2019
url http://ir.uitm.edu.my/id/eprint/34057/1/34057.pdf
http://ir.uitm.edu.my/id/eprint/34057/
_version_ 1685651142605799424
spelling my.uitm.ir.340572020-08-26T00:46:33Z http://ir.uitm.edu.my/id/eprint/34057/ Menara Kerja Raya (MKR) / Qyu Ray Joseph Suleiman ... [et al.] Qyu Ray, Joseph Suleiman Syed Muhamad Shafuan, Syed Zol Kanain Faten Nur Ezzatie, Baharin Nur Najwa, Noran Maintenance and repair Management of the construction site. Superintendence of building construction Building inspection The ‘Menara Kerja Raya’ are located at Jalan Sultan Salahuddin, 50580 Kuala Lumpur with total of 37 floor level. It is a cooperate office which served as the headquarter of the Ministry of works of Malaysia. The tower were built starting from 1st December 2009 and completed on 28th March 2012 with various parties involve during process of completing the tower such as the GDP Architect, ARUP consultant, Metropolis design consultant, IEN consultant and ZETTA consultant. With the total RM 309,374,000.00 as the built up cost, the tower were built up to 168m in height provided with GFA of 52 271 square metre. Facilities provided within the MKR consisted from Surau and cafe at level 3 while there is pantry at every floor level at the office area. The company in charge for maintaining the tower is the KCJ engineering company whereas they first operate at the property in November 2016 and each systems of the building such as Building management system, elevator, landscaping and cleaning are handled by an out-source company with contract. Maintenance programme were prepared to carry out it’s maintenance work for each of the system especially in cold water supply, fire fighting, GBI component, BMS, plant system as well as electrical system. The concept of the MKR is the diamond glass which the tower are installed high performance envelope which is meant to reduce heat transfer. MKR is a certified green building index with the rating of platinum equipped with GBI components consisted of rain water harvesting, grey water recycling, solar panel, intelligent lighting control, and building management system. The other factors that contributed to the rating of the MKR are the sustainable material used, site planning and management, waste management, recycle material and others but the highest assessment that contributed to the GBI rating is the Energy efficiency(EE) with total point of 35 out of 90. The Building Management system are installed at the MKR with purpose of monitoring and controlling the lighting control, fire protection, lift and MSB system. In buiding condition assessment, inspection does cover entirely on the building because of limitation on access of every floor. There are total of 21 defect found during the inspection and rating of the building based on the defect recorded does not represent entirely and need to be justify. The type of defect found consisted of mould growth, crack, stain mark, peeling of paint, rusting, and missing. On the maintenance planning, there are systems involved in short, medium and long term based on the maintenance programme provided access for maintenance are either at normal office hour and direct maintenance work which is the emergency repair for example leaking of pipe at the Male toilet. The only tenant in MKR is at the cafe where there are cafe B and A, each cafe are provided with three lot. In terms of contract service, the Hitachi elevator are under comprehensive maintenance where the 16 lift installed at the tower are fully maintained by the service provider with monthly payment according to the contract agreed from both parties. With inspection carried out and supported with photos, all the clauses according to each of the law does comply with the MKR. The only income generated from the MKR are the rent needed to be paid each month. In maintenance management, cash flow for maintenance were tabulated in an according form to show the income and expenditure of maintenance. Forecast are then projected to 3 years ahead starting from 2019 until 2021. 2019 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/34057/1/34057.pdf Qyu Ray, Joseph Suleiman and Syed Muhamad Shafuan, Syed Zol Kanain and Faten Nur Ezzatie, Baharin and Nur Najwa, Noran (2019) Menara Kerja Raya (MKR) / Qyu Ray Joseph Suleiman ... [et al.]. [Student Project] (Unpublished)
score 13.160551