The case for value management to be included in every construction project design process / Aini Jaapar
Value management (VM) in construction is the term to describe the total process of enhancing value for the Client from a project through concept to operation. While lower cost can be achieved through the traditional cost saving exercises, neither quality nor value can be guaranteed. Professionals in...
Saved in:
Main Author: | Jaapar, Aini |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2000
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/2636/1/TM_AINI%20JAAPAR%20AP%2000_5%201.pdf https://ir.uitm.edu.my/id/eprint/2636/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Professional competencies of architecture graduates: perceptions from graduates, academics and employers in the Nigerian construction industry / Joy Joshua Maina.
by: Maina, Joy Joshua
Published: (2018) -
A framework of coordination factors affecting design and build projects’ performance in Malaysia / Misbah Mohamed Abdulwahed Ohag
by: Abdulwahed Ohag, Misbah Mohamed
Published: (2022) -
Perception of sustainable refurbishment in Sarawak construction industry / Muhd Afiq Qayyum Latif
by: Latif, Muhd Afiq Qayyum
Published: (2021) -
Assisting female artists and architects : a user centered approach adopted by Design Library, University of Dammam, Kingdom of Saudi Arabia / Saima Qutab and Raed Al-Bukhari
by: Qutab, Saima, et al.
Published: (2014) -
Architectural finishing work / Rais Adlan Ruzaidi
by: Ruzaidi, Rais Adlan
Published: (2014)