Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad

Work study is the systematic analysis of all facets of a job with the objective of arranging it so that maximum efficiency is obtained from labor, plant, equipment, materials and supervision. It achieves this by detailed examination and recording of all the various aspects of the job so that all rel...

Full description

Saved in:
Bibliographic Details
Main Authors: Ibrahim, Mohd Nazlizan, Abdul Hamid, Norhissham, Wan Mohamad, Wan Nazrul Faizal
Format: Student Project
Language:English
Published: Faculty of Mechanical Engineering 2002
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/26052/1/PPd_MOHD%20NAZLIZAN%20IBRAHIM%20EM%2002_5.pdf
http://ir.uitm.edu.my/id/eprint/26052/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.26052
record_format eprints
spelling my.uitm.ir.260522019-10-09T00:54:51Z http://ir.uitm.edu.my/id/eprint/26052/ Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad Ibrahim, Mohd Nazlizan Abdul Hamid, Norhissham Wan Mohamad, Wan Nazrul Faizal Mechanical devices and figures. Automata. Ingenious mechanisms.Robots (General) Work study is the systematic analysis of all facets of a job with the objective of arranging it so that maximum efficiency is obtained from labor, plant, equipment, materials and supervision. It achieves this by detailed examination and recording of all the various aspects of the job so that all relevant information will be brought to light and presented to management to enable them to make the right decisions instead of using intuitive guess work. The human aspect is the most important part of work-study, both on site and at higher management level and the subject consist just as much of human relations as it does of techniques. Faculty of Mechanical Engineering 2002 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/26052/1/PPd_MOHD%20NAZLIZAN%20IBRAHIM%20EM%2002_5.pdf Ibrahim, Mohd Nazlizan and Abdul Hamid, Norhissham and Wan Mohamad, Wan Nazrul Faizal (2002) Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad. [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Mechanical devices and figures. Automata. Ingenious mechanisms.Robots (General)
spellingShingle Mechanical devices and figures. Automata. Ingenious mechanisms.Robots (General)
Ibrahim, Mohd Nazlizan
Abdul Hamid, Norhissham
Wan Mohamad, Wan Nazrul Faizal
Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad
description Work study is the systematic analysis of all facets of a job with the objective of arranging it so that maximum efficiency is obtained from labor, plant, equipment, materials and supervision. It achieves this by detailed examination and recording of all the various aspects of the job so that all relevant information will be brought to light and presented to management to enable them to make the right decisions instead of using intuitive guess work. The human aspect is the most important part of work-study, both on site and at higher management level and the subject consist just as much of human relations as it does of techniques.
format Student Project
author Ibrahim, Mohd Nazlizan
Abdul Hamid, Norhissham
Wan Mohamad, Wan Nazrul Faizal
author_facet Ibrahim, Mohd Nazlizan
Abdul Hamid, Norhissham
Wan Mohamad, Wan Nazrul Faizal
author_sort Ibrahim, Mohd Nazlizan
title Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad
title_short Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad
title_full Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad
title_fullStr Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad
title_full_unstemmed Work study in factory (cable slack making operation) / Mohd Nazlizan Ibrahim, Norhissham Abdul Hamid and Wan Nazrul Faizal Wan Mohamad
title_sort work study in factory (cable slack making operation) / mohd nazlizan ibrahim, norhissham abdul hamid and wan nazrul faizal wan mohamad
publisher Faculty of Mechanical Engineering
publishDate 2002
url http://ir.uitm.edu.my/id/eprint/26052/1/PPd_MOHD%20NAZLIZAN%20IBRAHIM%20EM%2002_5.pdf
http://ir.uitm.edu.my/id/eprint/26052/
_version_ 1685650084633509888
score 13.15806