A study on building defects in newly completed high-rise residential buildings during defects liability period / Zarul Azkief Che Zulkifli
In recent times. buildings defects are constantly arising in Malaysia though it is a newly completed building. These might be happened due to the poor of workmanship and the use of less quality materials. Although the defects of new buildings are not that bad, but it is yet to demonstrate that the s...
Saved in:
Main Author: | Che Zulkifli, Zarul Azkief |
---|---|
Format: | Thesis |
Language: | English |
Published: |
Faculty of Architecture, Planning and Surveying
2009
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/25898/2/25898.pdf https://ir.uitm.edu.my/id/eprint/25898/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Defect study during defect liability period / Mohd Asrul Hassin
by: Hassin, Mohd Asrul
Published: (2010) -
Defect liability period / Muhamad Zairi Hamdan
by: Hamdan, Muhamad Zairi
Published: (2022) -
Building defect: The implication of plants on building elements / Nurul Fatehah Md Nadzri
by: Md Nadzri, Nurul Fatehah
Published: (2015) -
Defect analysis of building apron and solutions / Mashita Abdul Razak.
by: Abdul Razak, Mashita
Published: (2009) -
Defect liability period, DLP (contractor responsibilities) / Abdillah Azizi Abdul Mu’en
by: Abdul Mu’en, Abdillah Azizi
Published: (2018)