Maintenance management of public building: Royal Custom Malaysia / Norfazleen Fakri

Maintenance Management is a combination of several actions in which to retain or restore an item to perform its required action. Royal Custom Malaysia as one of the government sector in Malaysia that has many assets, needs maintenance to prevent the assets from deterioration. Maintenance in Custom b...

Full description

Saved in:
Bibliographic Details
Main Author: Fakri, Norfazleen
Format: Student Project
Language:English
Published: Faculty of Architecture, Planning and Surveying 2008
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/25847/2/25847.pdf
https://ir.uitm.edu.my/id/eprint/25847/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.25847
record_format eprints
spelling my.uitm.ir.258472022-12-21T03:05:55Z https://ir.uitm.edu.my/id/eprint/25847/ Maintenance management of public building: Royal Custom Malaysia / Norfazleen Fakri Fakri, Norfazleen Maintenance and repair Management of the construction site. Superintendence of building construction Maintenance Management is a combination of several actions in which to retain or restore an item to perform its required action. Royal Custom Malaysia as one of the government sector in Malaysia that has many assets, needs maintenance to prevent the assets from deterioration. Maintenance in Custom building has a different ways of monitor and control which is according to Custom branch. There are two maintenance system presently implemented at Custom: Preventive maintenance and Corrective Maintenance. Aim of this study to propose maintenance management system. To achieve the aim of this study, four objectives have been set, to study the maintenance management system presently implemented. To identify the common problem in maintenance management. To find out the satisfaction level of Custom’s staff which occurring at the Custom building. To improve the maintenance management system for buildings at Custom building. All data analysis had been compile in case of maintenance management system that Custom had been used. To obtain the data the following knowledge acquisition methods were used by interview, questionnaire and observation. Result of the study showed the responds of the Custom staff for the overall building conditions are based on the building which is located at Kelana Jaya, Putrajaya, Kota Bharu and Rantau Panjang. Hence, to improve the current maintenance management system for Custom building, strategic planning has been suggested in order to increase performance, to provide an effective maintenance management, provide control for maintenance activities, improve quality, cost effective satisfaction, and to optimize the maintenance processes for Custom building. Faculty of Architecture, Planning and Surveying 2008 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/25847/2/25847.pdf Maintenance management of public building: Royal Custom Malaysia / Norfazleen Fakri. (2008) [Student Project] <http://terminalib.uitm.edu.my/25847.pdf> (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Maintenance and repair
Management of the construction site. Superintendence of building construction
spellingShingle Maintenance and repair
Management of the construction site. Superintendence of building construction
Fakri, Norfazleen
Maintenance management of public building: Royal Custom Malaysia / Norfazleen Fakri
description Maintenance Management is a combination of several actions in which to retain or restore an item to perform its required action. Royal Custom Malaysia as one of the government sector in Malaysia that has many assets, needs maintenance to prevent the assets from deterioration. Maintenance in Custom building has a different ways of monitor and control which is according to Custom branch. There are two maintenance system presently implemented at Custom: Preventive maintenance and Corrective Maintenance. Aim of this study to propose maintenance management system. To achieve the aim of this study, four objectives have been set, to study the maintenance management system presently implemented. To identify the common problem in maintenance management. To find out the satisfaction level of Custom’s staff which occurring at the Custom building. To improve the maintenance management system for buildings at Custom building. All data analysis had been compile in case of maintenance management system that Custom had been used. To obtain the data the following knowledge acquisition methods were used by interview, questionnaire and observation. Result of the study showed the responds of the Custom staff for the overall building conditions are based on the building which is located at Kelana Jaya, Putrajaya, Kota Bharu and Rantau Panjang. Hence, to improve the current maintenance management system for Custom building, strategic planning has been suggested in order to increase performance, to provide an effective maintenance management, provide control for maintenance activities, improve quality, cost effective satisfaction, and to optimize the maintenance processes for Custom building.
format Student Project
author Fakri, Norfazleen
author_facet Fakri, Norfazleen
author_sort Fakri, Norfazleen
title Maintenance management of public building: Royal Custom Malaysia / Norfazleen Fakri
title_short Maintenance management of public building: Royal Custom Malaysia / Norfazleen Fakri
title_full Maintenance management of public building: Royal Custom Malaysia / Norfazleen Fakri
title_fullStr Maintenance management of public building: Royal Custom Malaysia / Norfazleen Fakri
title_full_unstemmed Maintenance management of public building: Royal Custom Malaysia / Norfazleen Fakri
title_sort maintenance management of public building: royal custom malaysia / norfazleen fakri
publisher Faculty of Architecture, Planning and Surveying
publishDate 2008
url https://ir.uitm.edu.my/id/eprint/25847/2/25847.pdf
https://ir.uitm.edu.my/id/eprint/25847/
_version_ 1753791817356148736
score 13.211508