Informal risk management practices for cost overruns in Malaysian public linear projects / Marina Musa

The Malaysian construction industry is associated with a high degree of risk due to the nature of its business activities, process, environment and organisation. However, systematic risk management is not practiced in most public construction projects in Malaysia. This situation leads to project fai...

Full description

Saved in:
Bibliographic Details
Main Author: Musa, Marina
Format: Book Section
Language:English
Published: Institute of Graduate Studies, UiTM 2015
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/19468/1/ABS_MARINA%20MUSA%20TDRA%20VOL%208%20IGS%2015.pdf
http://ir.uitm.edu.my/id/eprint/19468/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.19468
record_format eprints
spelling my.uitm.ir.194682018-06-12T01:26:25Z http://ir.uitm.edu.my/id/eprint/19468/ Informal risk management practices for cost overruns in Malaysian public linear projects / Marina Musa Musa, Marina Risk management. Risk in industry. Operational risk The Malaysian construction industry is associated with a high degree of risk due to the nature of its business activities, process, environment and organisation. However, systematic risk management is not practiced in most public construction projects in Malaysia. This situation leads to project failure such as cost overrun, schedule slip and poor quality performance. Risk management is important to improve project performance in term of cost, time and quality. There is little information on the way informal reactive risk management practice contributes either positively or negatively to the project outcomes. The aim of this study was to understand the influence of informal risk management practice to mitigate cost overruns in Malaysian linear-type public projects. It involved projects that had cost overruns and were supervised by Malaysian government technical agencies on behalf of Malaysian ministries and other government agencies. A qualitative-quantitative research methodology was used. The qualitative study involved interviews with a triad of client, consultant and contractor participants in 15 projects. Inductive content analysis produced 16 categories of risk factors, 3 categories of risk treatments, 6 categories of barriers to risk treatment usage and 5 categories of coping actions to overcome the barriers to risk treatment usage… Institute of Graduate Studies, UiTM 2015 Book Section PeerReviewed text en http://ir.uitm.edu.my/id/eprint/19468/1/ABS_MARINA%20MUSA%20TDRA%20VOL%208%20IGS%2015.pdf Musa, Marina (2015) Informal risk management practices for cost overruns in Malaysian public linear projects / Marina Musa. In: The Doctoral Research Abstracts. IGS Biannual Publication, 8 (8). Institute of Graduate Studies, UiTM, Shah Alam.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Risk management. Risk in industry. Operational risk
spellingShingle Risk management. Risk in industry. Operational risk
Musa, Marina
Informal risk management practices for cost overruns in Malaysian public linear projects / Marina Musa
description The Malaysian construction industry is associated with a high degree of risk due to the nature of its business activities, process, environment and organisation. However, systematic risk management is not practiced in most public construction projects in Malaysia. This situation leads to project failure such as cost overrun, schedule slip and poor quality performance. Risk management is important to improve project performance in term of cost, time and quality. There is little information on the way informal reactive risk management practice contributes either positively or negatively to the project outcomes. The aim of this study was to understand the influence of informal risk management practice to mitigate cost overruns in Malaysian linear-type public projects. It involved projects that had cost overruns and were supervised by Malaysian government technical agencies on behalf of Malaysian ministries and other government agencies. A qualitative-quantitative research methodology was used. The qualitative study involved interviews with a triad of client, consultant and contractor participants in 15 projects. Inductive content analysis produced 16 categories of risk factors, 3 categories of risk treatments, 6 categories of barriers to risk treatment usage and 5 categories of coping actions to overcome the barriers to risk treatment usage…
format Book Section
author Musa, Marina
author_facet Musa, Marina
author_sort Musa, Marina
title Informal risk management practices for cost overruns in Malaysian public linear projects / Marina Musa
title_short Informal risk management practices for cost overruns in Malaysian public linear projects / Marina Musa
title_full Informal risk management practices for cost overruns in Malaysian public linear projects / Marina Musa
title_fullStr Informal risk management practices for cost overruns in Malaysian public linear projects / Marina Musa
title_full_unstemmed Informal risk management practices for cost overruns in Malaysian public linear projects / Marina Musa
title_sort informal risk management practices for cost overruns in malaysian public linear projects / marina musa
publisher Institute of Graduate Studies, UiTM
publishDate 2015
url http://ir.uitm.edu.my/id/eprint/19468/1/ABS_MARINA%20MUSA%20TDRA%20VOL%208%20IGS%2015.pdf
http://ir.uitm.edu.my/id/eprint/19468/
_version_ 1685649217971814400
score 13.149126