Tailor system using earliest due date scheduling technique / Suhailah Othman
Tailor System Using Earliest Due Date Scheduling Technique is about producing schedule to align the customer booking that include the time for and promise date from tailor for each customer. First of all, before producing this schedule, some data need to capture and analyzes like processing time for...
Saved in:
Main Author: | Suhailah, Othman |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2017
|
Online Access: | http://ir.uitm.edu.my/id/eprint/18304/1/TD_SUHAILAH%20OTHMAN%20CS%2017_5.pdf http://ir.uitm.edu.my/id/eprint/18304/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The earliest Waqf in Malaysia
by: Md Dahlan, Salehudin, et al.
Published: (2018) -
Coordination of production scheduling and vehicle routing problem with due dates
by: Johar, F., et al.
Published: (2016) -
Scheduling Problem with Fuzzy Due-dates on Unrelated Parallel Processors
by: Kanesan , Muthusamy, et al.
Published: (2000) -
Single Machine Common Due Date Scheduling Problems Using Neural Network
by: Hamad, Abdelaziz, et al.
Published: (2002) -
Coordination of production scheduling and vehicle routing problem with release and due date
by: Johar, Farhana, et al.
Published: (2015)