Repair and maintenance cost of combine harvester in rice harvesting at Kedah / Mohammad Izwan Ismail

A research was conducted to investigating the factor that effect repair and maintenance cost of combine harvester. Combine harvester is use to overcome shortage of manpower in agriculture sector. Repair and maintenance cost is the main factor in order to select a new or second hand combine harvester...

Full description

Saved in:
Bibliographic Details
Main Author: Ismail, Mohammad Izwan
Format: Student Project
Language:English
Published: Faculty of Plantation and Agrotechnology 2015
Online Access:http://ir.uitm.edu.my/id/eprint/16962/2/PPb_MOHAMMAD%20IZWAN%20ISMAIL%20AT%2015_5.pdf
http://ir.uitm.edu.my/id/eprint/16962/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.16962
record_format eprints
spelling my.uitm.ir.169622019-08-09T03:04:02Z http://ir.uitm.edu.my/id/eprint/16962/ Repair and maintenance cost of combine harvester in rice harvesting at Kedah / Mohammad Izwan Ismail Ismail, Mohammad Izwan A research was conducted to investigating the factor that effect repair and maintenance cost of combine harvester. Combine harvester is use to overcome shortage of manpower in agriculture sector. Repair and maintenance cost is the main factor in order to select a new or second hand combine harvester because the capacity or age of the machine may increase the cost of repair and maintenance. Common model of combine harvester that is mainly use in Malaysia is New Holland. The research was conducted in Langkawi and Kota Setar district. This research is significant for the conductor or owner to decide the best combine harvester before purchasing. The combine harvester with several ability and durability that can enhance the efficiency of the combine harvester in harvesting operation . Cross section survey that is use to collect the data and regression and correlation matrix is the data interpreted result in the research model. The distribution of critical parts have changed during repair and maintenance cost activities are ground speed vari-drive (24%), shaft tire (18%) and grain elevator drive (9%), for the maintenance in off season the part normally changed are wheel, conveyor belt and pump bush track (10%), Soucy track (9%), and, straw walker and header (8%). Combine harvester need to be repair and maintenance after usage in between 60I to 900 hours in seasons. The owner or farmer need to repair and maintained the combine harvester to reduce the factor that enhance combine harvester breakdown. This problem needs to overcome to reduce the losses to owner of combine harvester. Machinery cost is the secondary highest cost after own the land. Faculty of Plantation and Agrotechnology 2015 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/16962/2/PPb_MOHAMMAD%20IZWAN%20ISMAIL%20AT%2015_5.pdf Ismail, Mohammad Izwan (2015) Repair and maintenance cost of combine harvester in rice harvesting at Kedah / Mohammad Izwan Ismail. [Student Project] (Unpublished)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
description A research was conducted to investigating the factor that effect repair and maintenance cost of combine harvester. Combine harvester is use to overcome shortage of manpower in agriculture sector. Repair and maintenance cost is the main factor in order to select a new or second hand combine harvester because the capacity or age of the machine may increase the cost of repair and maintenance. Common model of combine harvester that is mainly use in Malaysia is New Holland. The research was conducted in Langkawi and Kota Setar district. This research is significant for the conductor or owner to decide the best combine harvester before purchasing. The combine harvester with several ability and durability that can enhance the efficiency of the combine harvester in harvesting operation . Cross section survey that is use to collect the data and regression and correlation matrix is the data interpreted result in the research model. The distribution of critical parts have changed during repair and maintenance cost activities are ground speed vari-drive (24%), shaft tire (18%) and grain elevator drive (9%), for the maintenance in off season the part normally changed are wheel, conveyor belt and pump bush track (10%), Soucy track (9%), and, straw walker and header (8%). Combine harvester need to be repair and maintenance after usage in between 60I to 900 hours in seasons. The owner or farmer need to repair and maintained the combine harvester to reduce the factor that enhance combine harvester breakdown. This problem needs to overcome to reduce the losses to owner of combine harvester. Machinery cost is the secondary highest cost after own the land.
format Student Project
author Ismail, Mohammad Izwan
spellingShingle Ismail, Mohammad Izwan
Repair and maintenance cost of combine harvester in rice harvesting at Kedah / Mohammad Izwan Ismail
author_facet Ismail, Mohammad Izwan
author_sort Ismail, Mohammad Izwan
title Repair and maintenance cost of combine harvester in rice harvesting at Kedah / Mohammad Izwan Ismail
title_short Repair and maintenance cost of combine harvester in rice harvesting at Kedah / Mohammad Izwan Ismail
title_full Repair and maintenance cost of combine harvester in rice harvesting at Kedah / Mohammad Izwan Ismail
title_fullStr Repair and maintenance cost of combine harvester in rice harvesting at Kedah / Mohammad Izwan Ismail
title_full_unstemmed Repair and maintenance cost of combine harvester in rice harvesting at Kedah / Mohammad Izwan Ismail
title_sort repair and maintenance cost of combine harvester in rice harvesting at kedah / mohammad izwan ismail
publisher Faculty of Plantation and Agrotechnology
publishDate 2015
url http://ir.uitm.edu.my/id/eprint/16962/2/PPb_MOHAMMAD%20IZWAN%20ISMAIL%20AT%2015_5.pdf
http://ir.uitm.edu.my/id/eprint/16962/
_version_ 1685648876391890944
score 13.160551