Reinforced concrete building design project and project based learning: case study / Muhammad Luqman Hakim Omar
The planning works are done on six different structures. Those structures are very essential to the development of the building. the foremost critical a part of the structure is taken from the planning key-plan so as to style the structure with the foremost suitable dimensions and reinforcements....
保存先:
第一著者: | |
---|---|
フォーマット: | Student Project |
言語: | English |
出版事項: |
2021
|
主題: | |
オンライン・アクセス: | https://ir.uitm.edu.my/id/eprint/104111/1/104111.pdf https://ir.uitm.edu.my/id/eprint/104111/ |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|