Post concrete work / Amir Hamzah Rashid Ridha

Post concrete was a very important part in construction, therefore this report will discuss the sequence work of post concrete after the casting work and removal of formwork. This report was conducted for 48-storey office tower located at Jalan lmbi, Bukit Bintang. The objective of this report is to...

Full description

Saved in:
Bibliographic Details
Main Author: Rashid Ridha, Amir Hamzah
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2019
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/100383/1/100383.pdf
https://ir.uitm.edu.my/id/eprint/100383/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.100383
record_format eprints
spelling my.uitm.ir.1003832024-08-28T01:56:39Z https://ir.uitm.edu.my/id/eprint/100383/ Post concrete work / Amir Hamzah Rashid Ridha Rashid Ridha, Amir Hamzah Building fittings and their installation Post concrete was a very important part in construction, therefore this report will discuss the sequence work of post concrete after the casting work and removal of formwork. This report was conducted for 48-storey office tower located at Jalan lmbi, Bukit Bintang. The objective of this report is to know the sequence work of post concrete, identify concrete problems on site and to know the rectification work for post concrete. To ensure the quality of the concrete and avoid any incident caused by poor concrete condition in the future. This report will explain the right procedure of post concrete work and what kind of defect on concrete that usually appeared after the removal of formwork. Universiti Teknologi MARA, Perak 2019 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/100383/1/100383.pdf Post concrete work / Amir Hamzah Rashid Ridha. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Building fittings and their installation
spellingShingle Building fittings and their installation
Rashid Ridha, Amir Hamzah
Post concrete work / Amir Hamzah Rashid Ridha
description Post concrete was a very important part in construction, therefore this report will discuss the sequence work of post concrete after the casting work and removal of formwork. This report was conducted for 48-storey office tower located at Jalan lmbi, Bukit Bintang. The objective of this report is to know the sequence work of post concrete, identify concrete problems on site and to know the rectification work for post concrete. To ensure the quality of the concrete and avoid any incident caused by poor concrete condition in the future. This report will explain the right procedure of post concrete work and what kind of defect on concrete that usually appeared after the removal of formwork.
format Monograph
author Rashid Ridha, Amir Hamzah
author_facet Rashid Ridha, Amir Hamzah
author_sort Rashid Ridha, Amir Hamzah
title Post concrete work / Amir Hamzah Rashid Ridha
title_short Post concrete work / Amir Hamzah Rashid Ridha
title_full Post concrete work / Amir Hamzah Rashid Ridha
title_fullStr Post concrete work / Amir Hamzah Rashid Ridha
title_full_unstemmed Post concrete work / Amir Hamzah Rashid Ridha
title_sort post concrete work / amir hamzah rashid ridha
publisher Universiti Teknologi MARA, Perak
publishDate 2019
url https://ir.uitm.edu.my/id/eprint/100383/1/100383.pdf
https://ir.uitm.edu.my/id/eprint/100383/
_version_ 1808976104984150016
score 13.19449