Post contract work during defect liability period / Nursyahirah Yusri

Post contract work, the last stage of the construction of building is important and should not be taken lightly by anyone, therefore this report will discuss about rectification of building defects during defect liability period. The defect liability period is the period of time from the date of del...

Full description

Saved in:
Bibliographic Details
Main Author: Yusri, Nursyahirah
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, UiTM Perak 2019
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/100344/1/100344.pdf
https://ir.uitm.edu.my/id/eprint/100344/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.100344
record_format eprints
spelling my.uitm.ir.1003442024-08-28T02:00:17Z https://ir.uitm.edu.my/id/eprint/100344/ Post contract work during defect liability period / Nursyahirah Yusri Yusri, Nursyahirah Building failures, errors, defects, etc. Post contract work, the last stage of the construction of building is important and should not be taken lightly by anyone, therefore this report will discuss about rectification of building defects during defect liability period. The defect liability period is the period of time from the date of delivery of vacant possession and keys delivered, where the developer is responsible to fix any defects occurred or found. Within this period, the homeowner will need to check for any damage, defects, as well as poor or faulty workmanship and need to report back to the developer if there are any issues of defect to get them repaired for free Universiti Teknologi MARA, UiTM Perak 2019 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/100344/1/100344.pdf Post contract work during defect liability period / Nursyahirah Yusri. (2019) Industrial Training. Universiti Teknologi MARA, UiTM Perak. (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Building failures, errors, defects, etc.
spellingShingle Building failures, errors, defects, etc.
Yusri, Nursyahirah
Post contract work during defect liability period / Nursyahirah Yusri
description Post contract work, the last stage of the construction of building is important and should not be taken lightly by anyone, therefore this report will discuss about rectification of building defects during defect liability period. The defect liability period is the period of time from the date of delivery of vacant possession and keys delivered, where the developer is responsible to fix any defects occurred or found. Within this period, the homeowner will need to check for any damage, defects, as well as poor or faulty workmanship and need to report back to the developer if there are any issues of defect to get them repaired for free
format Monograph
author Yusri, Nursyahirah
author_facet Yusri, Nursyahirah
author_sort Yusri, Nursyahirah
title Post contract work during defect liability period / Nursyahirah Yusri
title_short Post contract work during defect liability period / Nursyahirah Yusri
title_full Post contract work during defect liability period / Nursyahirah Yusri
title_fullStr Post contract work during defect liability period / Nursyahirah Yusri
title_full_unstemmed Post contract work during defect liability period / Nursyahirah Yusri
title_sort post contract work during defect liability period / nursyahirah yusri
publisher Universiti Teknologi MARA, UiTM Perak
publishDate 2019
url https://ir.uitm.edu.my/id/eprint/100344/1/100344.pdf
https://ir.uitm.edu.my/id/eprint/100344/
_version_ 1808976102032408576
score 13.19449