The construction of driveway / Izzat Farhan Mohd Razali

House Car Parking Lot or the term used in construction, Driveway is the place to park vehicles in front of the main door and behind the house gate safely. This is the topic among the overall construction project that the author focused on for his report. This report is to make sure the author fulfil...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Razali, Izzat Farhan
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2018
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/100191/1/100191.pdf
https://ir.uitm.edu.my/id/eprint/100191/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.100191
record_format eprints
spelling my.uitm.ir.1001912024-08-28T19:11:18Z https://ir.uitm.edu.my/id/eprint/100191/ The construction of driveway / Izzat Farhan Mohd Razali Mohd Razali, Izzat Farhan Buildings: Construction with reference to use.Including public buildings, dwellings House Car Parking Lot or the term used in construction, Driveway is the place to park vehicles in front of the main door and behind the house gate safely. This is the topic among the overall construction project that the author focused on for his report. This report is to make sure the author fulfills the requirements of the current semester's assignment and to give the output or as a result of his practical training during the three months span. This report is also important as a proof that the author understands completely about the course he is currently going through. The main objective of this report is to observe and determine the method, cost, time, workmanship, types of test used for Driveways, and problems that occurred during the progress and provides solutions. Mainly, for what the author was doing during the construction of the driveway was pin-pointing the position of driveway perimeter, levelling drop point, and laying the layers of the driveway. Lastly, the most important thing for this particular work is accuracy, for it is crucial to make sure the data collected, the input and output data transferring, and markings are accurate and precise so it will not drag and bring problems to the upcoming procedure ahead of the driveway construction. Early mistakes may result in repairs, maintenance, defects, failures, or even damages in the future which will bring more complex issues in variety of kind. Universiti Teknologi MARA, Perak 2018 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/100191/1/100191.pdf The construction of driveway / Izzat Farhan Mohd Razali. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Buildings: Construction with reference to use.Including public buildings, dwellings
spellingShingle Buildings: Construction with reference to use.Including public buildings, dwellings
Mohd Razali, Izzat Farhan
The construction of driveway / Izzat Farhan Mohd Razali
description House Car Parking Lot or the term used in construction, Driveway is the place to park vehicles in front of the main door and behind the house gate safely. This is the topic among the overall construction project that the author focused on for his report. This report is to make sure the author fulfills the requirements of the current semester's assignment and to give the output or as a result of his practical training during the three months span. This report is also important as a proof that the author understands completely about the course he is currently going through. The main objective of this report is to observe and determine the method, cost, time, workmanship, types of test used for Driveways, and problems that occurred during the progress and provides solutions. Mainly, for what the author was doing during the construction of the driveway was pin-pointing the position of driveway perimeter, levelling drop point, and laying the layers of the driveway. Lastly, the most important thing for this particular work is accuracy, for it is crucial to make sure the data collected, the input and output data transferring, and markings are accurate and precise so it will not drag and bring problems to the upcoming procedure ahead of the driveway construction. Early mistakes may result in repairs, maintenance, defects, failures, or even damages in the future which will bring more complex issues in variety of kind.
format Monograph
author Mohd Razali, Izzat Farhan
author_facet Mohd Razali, Izzat Farhan
author_sort Mohd Razali, Izzat Farhan
title The construction of driveway / Izzat Farhan Mohd Razali
title_short The construction of driveway / Izzat Farhan Mohd Razali
title_full The construction of driveway / Izzat Farhan Mohd Razali
title_fullStr The construction of driveway / Izzat Farhan Mohd Razali
title_full_unstemmed The construction of driveway / Izzat Farhan Mohd Razali
title_sort construction of driveway / izzat farhan mohd razali
publisher Universiti Teknologi MARA, Perak
publishDate 2018
url https://ir.uitm.edu.my/id/eprint/100191/1/100191.pdf
https://ir.uitm.edu.my/id/eprint/100191/
_version_ 1808976093349150720
score 13.19449