Scheduling Problem with Fuzzy Due-dates on Unrelated Parallel Processors
Most of scheduling problems considered so far treats non-flexible due-dates only. In this paper, we consider scheduling problem with fuzzy due-dates on unrelated parallel processors. There are m processors and n jobs to be processed on these processors. A membership function is associated with each...
Saved in:
Main Authors: | Kanesan , Muthusamy, Ishii, Hiroaki |
---|---|
Format: | Conference or Workshop Item |
Published: |
2000
|
Subjects: | |
Online Access: | http://library.oum.edu.my/repository/621/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Scheduling problems with generalized precedence relations
by: Kanesan , Muthusamy, et al.
Published: (1999) -
Scheduling with fuzzy delays and fuzzy precedences
by: Kanesan , Muthusamy, et al.
Published: (2003) -
Beam Search Approach for the Multiobjective Flow-shop Scheduling Problem
by: Kanesan , Muthusamy, et al.
Published: (2000) -
A Neural Network for Common Due Date Job Scheduling Problem on Parallel Unrelated Machines
by: Hamad, Abdelaziz, et al.
Published: (2001) -
A neural network model for the common due date job scheduling on unrelated parallel machines
by: Hamad, S, et al.
Published: (2003)