Proposal of upgrading Isfahan north wastewater treatment plant: An adsorption/bio-oxidation process with emphasis on excess sludge reduction and nutrient removal

There is a rising challenge in managing the activated sludge process due to excess sludge disposal from the wastewater treatment plant and inadequate effluent quality due to the stricter standard of effluent quality. Hence, the incorporation of oxic-settling-anoxic process and ultrasonic waves in th...

Full description

Saved in:
Bibliographic Details
Main Authors: Amin, Mohammad Mehdi, Taheri, Ensiyeh, Ghasemian, Mohammad, Mohamad Puad, Noor Illi, Dehdashti, Bahare, Fatehizadeh, Ali
Format: Article
Language:English
English
English
Published: Elsevier 2020
Subjects:
Online Access:http://irep.iium.edu.my/78452/7/78452%20Proposal%20of%20upgrading%20Isfahan%20north%20wastewater%20treatment%20plant.pdf
http://irep.iium.edu.my/78452/8/78452%20Proposal%20of%20upgrading%20Isfahan%20north%20wastewater%20treatment%20plant%20SCOPUS.pdf
http://irep.iium.edu.my/78452/19/78452_Proposal%20of%20upgrading%20Isfahan%20north%20wastewater_WOS.pdf
http://irep.iium.edu.my/78452/
https://www.sciencedirect.com/science/article/pii/S0959652620302948
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.iium.irep.78452
record_format dspace
spelling my.iium.irep.784522020-04-21T07:24:53Z http://irep.iium.edu.my/78452/ Proposal of upgrading Isfahan north wastewater treatment plant: An adsorption/bio-oxidation process with emphasis on excess sludge reduction and nutrient removal Amin, Mohammad Mehdi Taheri, Ensiyeh Ghasemian, Mohammad Mohamad Puad, Noor Illi Dehdashti, Bahare Fatehizadeh, Ali TA170 Environmental engineering There is a rising challenge in managing the activated sludge process due to excess sludge disposal from the wastewater treatment plant and inadequate effluent quality due to the stricter standard of effluent quality. Hence, the incorporation of oxic-settling-anoxic process and ultrasonic waves in the return sludge line was proposed to assess the excess sludge reduction and nutrient removal in the adsorption/bio-oxidation activated sludge process as a proposal upgrading. The results indicated that sludge production from adsorption/bio-oxidation process could be reduced using oxic-settling-anoxic and ultrasonic by 50% at each studied mixed liquor suspended solids level. Compared to the adsorption/bio-oxidation process, the total and soluble chemical oxygen demand removal efficiencies in adsorption/bio-oxidation process with oxic-settling-anoxic and ultrasonic slightly decreased suggesting a lysis phenomenon. During the operation of adsorption/bio-oxidation process with oxic-settling-anoxic and ultrasonic, the total Kjeldahl nitrogen removal efficiency improved in A and B stages, with 38.3 ± 8.1% and 83.1 ± 6.5% versus 36.8 ± 14.5% and 75.1 ± 7.3%, respectively. According to the stoichiometric calculations, in B stage of adsorption/bio-oxidation process with oxic-settling-anoxic and ultrasonic, the soluble available ultimate biochemical oxygen demand and net NO3 produced for denitrification were 69.5 and 43.8 mg/L, respectively. Overall, the experimental data revealed that the adsorption/bio-oxidation process with oxic-settling-anoxic and ultrasonic produced lower excess biological sludge and better total Kjeldahl nitrogen removal efficiency compared to the adsorption/bio-oxidation system alone. Elsevier 2020-05 Article PeerReviewed application/pdf en http://irep.iium.edu.my/78452/7/78452%20Proposal%20of%20upgrading%20Isfahan%20north%20wastewater%20treatment%20plant.pdf application/pdf en http://irep.iium.edu.my/78452/8/78452%20Proposal%20of%20upgrading%20Isfahan%20north%20wastewater%20treatment%20plant%20SCOPUS.pdf application/pdf en http://irep.iium.edu.my/78452/19/78452_Proposal%20of%20upgrading%20Isfahan%20north%20wastewater_WOS.pdf Amin, Mohammad Mehdi and Taheri, Ensiyeh and Ghasemian, Mohammad and Mohamad Puad, Noor Illi and Dehdashti, Bahare and Fatehizadeh, Ali (2020) Proposal of upgrading Isfahan north wastewater treatment plant: An adsorption/bio-oxidation process with emphasis on excess sludge reduction and nutrient removal. Journal of Cleaner Production, 255. pp. 1-12. ISSN 0959-6526 https://www.sciencedirect.com/science/article/pii/S0959652620302948 10.1016/j.jclepro.2020.120247
institution Universiti Islam Antarabangsa Malaysia
building IIUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider International Islamic University Malaysia
content_source IIUM Repository (IREP)
url_provider http://irep.iium.edu.my/
language English
English
English
topic TA170 Environmental engineering
spellingShingle TA170 Environmental engineering
Amin, Mohammad Mehdi
Taheri, Ensiyeh
Ghasemian, Mohammad
Mohamad Puad, Noor Illi
Dehdashti, Bahare
Fatehizadeh, Ali
Proposal of upgrading Isfahan north wastewater treatment plant: An adsorption/bio-oxidation process with emphasis on excess sludge reduction and nutrient removal
description There is a rising challenge in managing the activated sludge process due to excess sludge disposal from the wastewater treatment plant and inadequate effluent quality due to the stricter standard of effluent quality. Hence, the incorporation of oxic-settling-anoxic process and ultrasonic waves in the return sludge line was proposed to assess the excess sludge reduction and nutrient removal in the adsorption/bio-oxidation activated sludge process as a proposal upgrading. The results indicated that sludge production from adsorption/bio-oxidation process could be reduced using oxic-settling-anoxic and ultrasonic by 50% at each studied mixed liquor suspended solids level. Compared to the adsorption/bio-oxidation process, the total and soluble chemical oxygen demand removal efficiencies in adsorption/bio-oxidation process with oxic-settling-anoxic and ultrasonic slightly decreased suggesting a lysis phenomenon. During the operation of adsorption/bio-oxidation process with oxic-settling-anoxic and ultrasonic, the total Kjeldahl nitrogen removal efficiency improved in A and B stages, with 38.3 ± 8.1% and 83.1 ± 6.5% versus 36.8 ± 14.5% and 75.1 ± 7.3%, respectively. According to the stoichiometric calculations, in B stage of adsorption/bio-oxidation process with oxic-settling-anoxic and ultrasonic, the soluble available ultimate biochemical oxygen demand and net NO3 produced for denitrification were 69.5 and 43.8 mg/L, respectively. Overall, the experimental data revealed that the adsorption/bio-oxidation process with oxic-settling-anoxic and ultrasonic produced lower excess biological sludge and better total Kjeldahl nitrogen removal efficiency compared to the adsorption/bio-oxidation system alone.
format Article
author Amin, Mohammad Mehdi
Taheri, Ensiyeh
Ghasemian, Mohammad
Mohamad Puad, Noor Illi
Dehdashti, Bahare
Fatehizadeh, Ali
author_facet Amin, Mohammad Mehdi
Taheri, Ensiyeh
Ghasemian, Mohammad
Mohamad Puad, Noor Illi
Dehdashti, Bahare
Fatehizadeh, Ali
author_sort Amin, Mohammad Mehdi
title Proposal of upgrading Isfahan north wastewater treatment plant: An adsorption/bio-oxidation process with emphasis on excess sludge reduction and nutrient removal
title_short Proposal of upgrading Isfahan north wastewater treatment plant: An adsorption/bio-oxidation process with emphasis on excess sludge reduction and nutrient removal
title_full Proposal of upgrading Isfahan north wastewater treatment plant: An adsorption/bio-oxidation process with emphasis on excess sludge reduction and nutrient removal
title_fullStr Proposal of upgrading Isfahan north wastewater treatment plant: An adsorption/bio-oxidation process with emphasis on excess sludge reduction and nutrient removal
title_full_unstemmed Proposal of upgrading Isfahan north wastewater treatment plant: An adsorption/bio-oxidation process with emphasis on excess sludge reduction and nutrient removal
title_sort proposal of upgrading isfahan north wastewater treatment plant: an adsorption/bio-oxidation process with emphasis on excess sludge reduction and nutrient removal
publisher Elsevier
publishDate 2020
url http://irep.iium.edu.my/78452/7/78452%20Proposal%20of%20upgrading%20Isfahan%20north%20wastewater%20treatment%20plant.pdf
http://irep.iium.edu.my/78452/8/78452%20Proposal%20of%20upgrading%20Isfahan%20north%20wastewater%20treatment%20plant%20SCOPUS.pdf
http://irep.iium.edu.my/78452/19/78452_Proposal%20of%20upgrading%20Isfahan%20north%20wastewater_WOS.pdf
http://irep.iium.edu.my/78452/
https://www.sciencedirect.com/science/article/pii/S0959652620302948
_version_ 1665894790756040704
score 13.159267