Experimental verification and simulation of two stages positive output cascade boost converter super-lift DC/DC Luo-converter

DC/DC converters have been developed very quickly. Since 1920s there have been more than 500 DC/DC converters topologies developed. Advanced DC/DC converter have been developed and created by Luo and. Ye in 2001. The aim of this study is to investigate and state a designed method to evaluate the...

Full description

Saved in:
Bibliographic Details
Main Authors: Hammoda, Ahmed, Buamud, Mohammed S., Tamasas, Mohamed Elrais, Mohamed, Adel, Khalil, Ashraf F., Nasr, Mahmoud Shaker, Khan, Sheroz
Format: Conference or Workshop Item
Language:English
English
Published: Institute of Electrical and Electronics Engineers Inc. 2018
Subjects:
Online Access:http://irep.iium.edu.my/66935/1/66935_Experimental%20Verification%20and%20Simulation%20of%20two_article.pdf
http://irep.iium.edu.my/66935/2/66935_Experimental%20Verification%20and%20Simulation%20of%20two_scopus.pdf
http://irep.iium.edu.my/66935/
https://ieeexplore.ieee.org/stamp/stamp.jsp?tp=&arnumber=8277883
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:DC/DC converters have been developed very quickly. Since 1920s there have been more than 500 DC/DC converters topologies developed. Advanced DC/DC converter have been developed and created by Luo and. Ye in 2001. The aim of this study is to investigate and state a designed method to evaluate the advanced DC/DC converter. The design should guarantee working in a continuous conduction mode and to improved system performance. Many researches and studies have been made for the converter. The two stages positive output cascade boost converter super-lift DC/DC Luo-converter is chosen as the case study of this paper. The system has been implemented over a wide range of experimental work and has been implemented in MATLAB/SIMULINK. Simulations and experimental results have been compared towards each other.