Implementation of lean manufacturing to blend with good manufacturing practice at Minda Tulus Industries Sdn. Bhd. for improved performance
The implementation of Lean Manufacturing System (LMS) together with the consideration of the Good Manufacturing Practice (GMP) can enhance the performance in the production as well as maintaining the highest quality of the product. The knowledge transfer program between International Islamic Univers...
Saved in:
Main Authors: | Nasry, Nasrul Ashraf, Mahmud, Khairus Syakirah, Hilmy, Irfan, M. I., Ismail, Hassan Basri, Rodziah |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Knowledge Transfer Programme © Knowledge Transfer Centre
2017
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/59382/1/59382_Implementation%20of%20Lean%20Manufacturing.pdf http://irep.iium.edu.my/59382/ http://www.ckt.usm.my/index.php/proceeding http://www.ckt.usm.my/index.php/proceeding |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Finite element modelling of damage fracture and fretting fatigue
by: Wahab, M. Abdel, et al.
Published: (2012) -
Development of design structure matrix of product architecture case study: multi purpose CNC router
by: Hilmy, Irfan, et al.
Published: (2014) -
Optimization of polymer blend electrolytes with tuneable
conductivity potentials
by: Nurhaziqah, A.M.S., et al. -
First Semester Examination Academic Session 2018/2019 December 2018/January 2019 EPM451 – Computer Integrated Manufacturing [Pembuatan Tersepadu Komputer] Duration : 3 hours Masa : 3 jam
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2019) -
First Semester Examination Academic Session 2018/2019 December 2018/January 2019 EPP201 – Manufacturing Technology I [Teknologi Pembuatan 1] Duration : 3 hours Masa : 3 jam
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2019)