Design of a heuristic for balancing a multi-stage production flow line
A production flow line balancing problem for automotive industry has been studied. A batch of an end item is produced by transforming sheet metals into parts at different manufacturing stages followed by assembly operations. The forming operations of the sheet metals into various parts and their ass...
Saved in:
Main Authors: | Kays, H. M. E., Karim, A. N. M., Tajudin, M. N. B., Abdesselam, M. |
---|---|
Format: | Article |
Language: | English |
Published: |
Trans Tech Publications, Switzerland
2015
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/48673/1/%2333_AMR.1115.610.pdf http://irep.iium.edu.my/48673/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Formulation of integer programming model for balancing and
scheduling of production line having shared resources
by: Emrul Kays, H. M., et al.
Published: (2014) -
Formulation of an IP-based model for reactive flow-shop scheduling problem subject to arrival of new orders
by: Abdesselam, M., et al.
Published: (2015) -
Scheduling and batching in multi-site flexible flow shop environments
by: Santos, A. S., et al.
Published: (2015) -
An integer programming approach for balancing and scheduling in extended manufacturing environment
by: Kays, H. M. E, et al.
Published: (2015) -
Assessment of machining cost for end-milling of Ti-6Al-4V titanium alloy through RSM-based parametric model
by: Karim, A.N. Mustafizul, et al.
Published: (2014)