Monitoring the performance of state structure plan in delivering output using dynamic model

Plan outputs are the material objects that are tangible and provided as a result of the implementation of a development plan. They often act as precursor to achieving plan outcomes. Therefore, it is important to monitor the performance of plan in delivering its outputs so that the prospect of achiev...

Full description

Saved in:
Bibliographic Details
Main Authors: Abdullah, Muhammad Faris, Abdullah, Alias, Mohd. Din, Shamzani Affendy, Zahari, Rustam Khairi, Jaafar, Samsuddin
Format: Conference or Workshop Item
Language:English
Published: 2015
Subjects:
Online Access:http://irep.iium.edu.my/44508/7/44508_Monitoring%20the%20performance%20of%20state%20structure%20plan_complete.pdf
http://irep.iium.edu.my/44508/
http://www.utm.my/apsa2015/?page_id=1208
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.iium.irep.44508
record_format dspace
spelling my.iium.irep.445082021-06-03T14:19:25Z http://irep.iium.edu.my/44508/ Monitoring the performance of state structure plan in delivering output using dynamic model Abdullah, Muhammad Faris Abdullah, Alias Mohd. Din, Shamzani Affendy Zahari, Rustam Khairi Jaafar, Samsuddin NA9053.R4 City planning NA9080 Urban planners T10.5 Communication of technical information Plan outputs are the material objects that are tangible and provided as a result of the implementation of a development plan. They often act as precursor to achieving plan outcomes. Therefore, it is important to monitor the performance of plan in delivering its outputs so that the prospect of achieving its outcomes remains high. However, present state structure plan monitoring programmes focus mostly on monitoring land use change and not plan output delivery. The absence of output monitoring reduces the usefulness of the programmes and contributes to under-provision of outputs, especially public facilities and open spaces. This study proposes that state structure plan monitoring programmes must include mechanism to monitor the performance of the plan in delivering plan outputs. To this end, a dynamic model for monitoring performance of state structure plan in delivering open spaces was developed using STELLA software and applied on the Selangor State Structure Plan. The model simulation showed that the Selangor State Structure Plan has performed poorly in delivering the open spaces where their provision has not conform to the plan’s targets. The model simulations also show that this non-conformances will remain by the end of the plan’s planning period. 2015 Conference or Workshop Item PeerReviewed application/pdf en http://irep.iium.edu.my/44508/7/44508_Monitoring%20the%20performance%20of%20state%20structure%20plan_complete.pdf Abdullah, Muhammad Faris and Abdullah, Alias and Mohd. Din, Shamzani Affendy and Zahari, Rustam Khairi and Jaafar, Samsuddin (2015) Monitoring the performance of state structure plan in delivering output using dynamic model. In: 13th International Congress of Asian Planning Schools Association (APSA 2015), 12th-14th August 2015, Johor Bahru, Johor. (Unpublished) http://www.utm.my/apsa2015/?page_id=1208
institution Universiti Islam Antarabangsa Malaysia
building IIUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider International Islamic University Malaysia
content_source IIUM Repository (IREP)
url_provider http://irep.iium.edu.my/
language English
topic NA9053.R4 City planning
NA9080 Urban planners
T10.5 Communication of technical information
spellingShingle NA9053.R4 City planning
NA9080 Urban planners
T10.5 Communication of technical information
Abdullah, Muhammad Faris
Abdullah, Alias
Mohd. Din, Shamzani Affendy
Zahari, Rustam Khairi
Jaafar, Samsuddin
Monitoring the performance of state structure plan in delivering output using dynamic model
description Plan outputs are the material objects that are tangible and provided as a result of the implementation of a development plan. They often act as precursor to achieving plan outcomes. Therefore, it is important to monitor the performance of plan in delivering its outputs so that the prospect of achieving its outcomes remains high. However, present state structure plan monitoring programmes focus mostly on monitoring land use change and not plan output delivery. The absence of output monitoring reduces the usefulness of the programmes and contributes to under-provision of outputs, especially public facilities and open spaces. This study proposes that state structure plan monitoring programmes must include mechanism to monitor the performance of the plan in delivering plan outputs. To this end, a dynamic model for monitoring performance of state structure plan in delivering open spaces was developed using STELLA software and applied on the Selangor State Structure Plan. The model simulation showed that the Selangor State Structure Plan has performed poorly in delivering the open spaces where their provision has not conform to the plan’s targets. The model simulations also show that this non-conformances will remain by the end of the plan’s planning period.
format Conference or Workshop Item
author Abdullah, Muhammad Faris
Abdullah, Alias
Mohd. Din, Shamzani Affendy
Zahari, Rustam Khairi
Jaafar, Samsuddin
author_facet Abdullah, Muhammad Faris
Abdullah, Alias
Mohd. Din, Shamzani Affendy
Zahari, Rustam Khairi
Jaafar, Samsuddin
author_sort Abdullah, Muhammad Faris
title Monitoring the performance of state structure plan in delivering output using dynamic model
title_short Monitoring the performance of state structure plan in delivering output using dynamic model
title_full Monitoring the performance of state structure plan in delivering output using dynamic model
title_fullStr Monitoring the performance of state structure plan in delivering output using dynamic model
title_full_unstemmed Monitoring the performance of state structure plan in delivering output using dynamic model
title_sort monitoring the performance of state structure plan in delivering output using dynamic model
publishDate 2015
url http://irep.iium.edu.my/44508/7/44508_Monitoring%20the%20performance%20of%20state%20structure%20plan_complete.pdf
http://irep.iium.edu.my/44508/
http://www.utm.my/apsa2015/?page_id=1208
_version_ 1702169433134333952
score 13.160551