Claiming damages for late delivery of vacant possession of private houses in Malaysia: legal issues and challenges
One of the main duties of the housing developer is to complete the construction of the house on time. Under the Malaysian housing law, the period of completion and handling over vacant possession for landed property is 24 months and for sub-divided building is 36 months. The buyer is entitled to cla...
محفوظ في:
المؤلفون الرئيسيون: | Amin, Naemah, Sufian, Azlinor, Syed Abdul Kader, Sharifah Zubaidah, Kassim, Salina |
---|---|
التنسيق: | مقال |
اللغة: | English |
منشور في: |
Academy of IRMBR
2014
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://irep.iium.edu.my/39200/1/IRMBR_article.pdf http://irep.iium.edu.my/39200/ http://www.irmbrjournal.com/archives2.php?vol=3&iss=2&yea=2014&ver=3 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Claiming damages for late delivery of vacant possession: an overview of legal issues and challenges
بواسطة: Amin, Naemah, وآخرون
منشور في: (2013) -
Protecting house buyers against late delivery of vacant possession: a case of Malaysia
بواسطة: Amin, Naemah, وآخرون
منشور في: (2014) -
Housing development and consumer protection: a study on the problems of late delivery of vacant possession
بواسطة: Amin, Naemah, وآخرون
منشور في: (2015) -
Housing development and consumer protection: a study on the issue of late delivery of vacant possession from the consumer perspective
بواسطة: Amin, Naemah, وآخرون
منشور في: (2014) -
Housing development and consumer protection: a study on the issue of late delivery of vacant possession from the consumer perspective
بواسطة: Amin, Naemah, وآخرون
منشور في: (2015)