Influential time and cost factors for commercial projects in the Malaysian construction industry

Time and cost play an important role in project completion for both developing and developed countries. This study aims to identify the critical factors that influence the time and cost of commercial projects in Malaysia. A detailed questionnaire survey was conducted with industry professionals, and...

Full description

Saved in:
Bibliographic Details
Main Authors: Sohu, Samiullah, Md. Kassim, Tahara Ramadzan, Khan, Omar Shahid, Bhatti, Sajjad Ahmed, Sohoo, Arslan Ahmed
Format: Article
Language:English
English
Published: Engineering, Technology & Applied Science Research 2024
Subjects:
Online Access:http://irep.iium.edu.my/113309/7/113309_Influential%20time%20and%20cost%20factors.pdf
http://irep.iium.edu.my/113309/8/113309_Influential%20time%20and%20cost%20factors_Scopus.pdf
http://irep.iium.edu.my/113309/
https://www.etasr.com/index.php/ETASR/article/view/7037
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.iium.irep.113309
record_format dspace
spelling my.iium.irep.1133092024-07-24T01:29:36Z http://irep.iium.edu.my/113309/ Influential time and cost factors for commercial projects in the Malaysian construction industry Sohu, Samiullah Md. Kassim, Tahara Ramadzan Khan, Omar Shahid Bhatti, Sajjad Ahmed Sohoo, Arslan Ahmed T Technology (General) TA Engineering (General). Civil engineering (General) TH Building construction Time and cost play an important role in project completion for both developing and developed countries. This study aims to identify the critical factors that influence the time and cost of commercial projects in Malaysia. A detailed questionnaire survey was conducted with industry professionals, and the results were analyzed based on the survey responses. The average index method was used to determine critical factors based on responses from professionals. The critical factors that affect time are poor contract management, client fund shortages, late drawing submissions, land acquisition problems, and inadequate surveying before construction. The critical factors identified for cost are delayed client payments, shortage of skilled workers, design changes, errors in the construction process, and changes in top management. This study raises awareness by identifying critical factors to minimize their impact so that construction can be completed on time and according to the defined budget, and maximize the benefits of future projects. Engineering, Technology & Applied Science Research 2024-06-01 Article PeerReviewed application/pdf en http://irep.iium.edu.my/113309/7/113309_Influential%20time%20and%20cost%20factors.pdf application/pdf en http://irep.iium.edu.my/113309/8/113309_Influential%20time%20and%20cost%20factors_Scopus.pdf Sohu, Samiullah and Md. Kassim, Tahara Ramadzan and Khan, Omar Shahid and Bhatti, Sajjad Ahmed and Sohoo, Arslan Ahmed (2024) Influential time and cost factors for commercial projects in the Malaysian construction industry. Engineering, Technology & Applied Science Research, 14 (3). pp. 14170-14174. ISSN 2241-4487 E-ISSN 1792-8036 https://www.etasr.com/index.php/ETASR/article/view/7037 10.48084/etasr.7037
institution Universiti Islam Antarabangsa Malaysia
building IIUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider International Islamic University Malaysia
content_source IIUM Repository (IREP)
url_provider http://irep.iium.edu.my/
language English
English
topic T Technology (General)
TA Engineering (General). Civil engineering (General)
TH Building construction
spellingShingle T Technology (General)
TA Engineering (General). Civil engineering (General)
TH Building construction
Sohu, Samiullah
Md. Kassim, Tahara Ramadzan
Khan, Omar Shahid
Bhatti, Sajjad Ahmed
Sohoo, Arslan Ahmed
Influential time and cost factors for commercial projects in the Malaysian construction industry
description Time and cost play an important role in project completion for both developing and developed countries. This study aims to identify the critical factors that influence the time and cost of commercial projects in Malaysia. A detailed questionnaire survey was conducted with industry professionals, and the results were analyzed based on the survey responses. The average index method was used to determine critical factors based on responses from professionals. The critical factors that affect time are poor contract management, client fund shortages, late drawing submissions, land acquisition problems, and inadequate surveying before construction. The critical factors identified for cost are delayed client payments, shortage of skilled workers, design changes, errors in the construction process, and changes in top management. This study raises awareness by identifying critical factors to minimize their impact so that construction can be completed on time and according to the defined budget, and maximize the benefits of future projects.
format Article
author Sohu, Samiullah
Md. Kassim, Tahara Ramadzan
Khan, Omar Shahid
Bhatti, Sajjad Ahmed
Sohoo, Arslan Ahmed
author_facet Sohu, Samiullah
Md. Kassim, Tahara Ramadzan
Khan, Omar Shahid
Bhatti, Sajjad Ahmed
Sohoo, Arslan Ahmed
author_sort Sohu, Samiullah
title Influential time and cost factors for commercial projects in the Malaysian construction industry
title_short Influential time and cost factors for commercial projects in the Malaysian construction industry
title_full Influential time and cost factors for commercial projects in the Malaysian construction industry
title_fullStr Influential time and cost factors for commercial projects in the Malaysian construction industry
title_full_unstemmed Influential time and cost factors for commercial projects in the Malaysian construction industry
title_sort influential time and cost factors for commercial projects in the malaysian construction industry
publisher Engineering, Technology & Applied Science Research
publishDate 2024
url http://irep.iium.edu.my/113309/7/113309_Influential%20time%20and%20cost%20factors.pdf
http://irep.iium.edu.my/113309/8/113309_Influential%20time%20and%20cost%20factors_Scopus.pdf
http://irep.iium.edu.my/113309/
https://www.etasr.com/index.php/ETASR/article/view/7037
_version_ 1805880579274571776
score 13.214268