FIELDBUS INTEROPERABILITY TESTING AND SYSTEM CONFIGURATION

This report is to discuss the research and Basic Interoperability testing for Foundation Fieldbus system, as well as the development of a control loop. Devices that use Foundation Fieldbus system cannot intemperate with devices from different manufacturers. PE1RONAS as the established company wil...

Full description

Saved in:
Bibliographic Details
Main Author: MOHAMED ALY ZAHER, MOHAMED ZAHER
Format: Final Year Project
Language:English
Published: Universiti Teknologi Petronas 2009
Subjects:
Online Access:http://utpedia.utp.edu.my/8758/1/2009%20-%20Fieldbus%20Onteroperability%20Testing%20and%20System%20Configuration.pdf
http://utpedia.utp.edu.my/8758/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utp-utpedia.8758
record_format eprints
spelling my-utp-utpedia.87582017-01-25T09:43:56Z http://utpedia.utp.edu.my/8758/ FIELDBUS INTEROPERABILITY TESTING AND SYSTEM CONFIGURATION MOHAMED ALY ZAHER, MOHAMED ZAHER TK Electrical engineering. Electronics Nuclear engineering This report is to discuss the research and Basic Interoperability testing for Foundation Fieldbus system, as well as the development of a control loop. Devices that use Foundation Fieldbus system cannot intemperate with devices from different manufacturers. PE1RONAS as the established company will apply Fieldbus technology in its plants. The objectives of the testing are to get a PETRONAS Technical standard on the Foundation Fieldbus system and come out with a report on the results from interoperability testing that will be the reference for system in PE1RONAS. The other objective is to test the controller performance using the three control modes, P, PI and PID. In order to achieve the objectives, first three tests should be done, basic interoperability test, Stress test and Diagnostic capability, and then a test on the controller performance will be held. Due to time constraint, UTP team was able to complete the Basic interoperability test and the control loop development. The author will only focus on testing HONEYWELL system and segment 2, provided by MTL. The Basic interoperability test was successfully done and the controller performance was successfully tested. The research about the Foundation Fieldbus should be performed continuously, to improve the system from time to time, and the analysis of results and reports will be used for future researches. Universiti Teknologi Petronas 2009-12 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/8758/1/2009%20-%20Fieldbus%20Onteroperability%20Testing%20and%20System%20Configuration.pdf MOHAMED ALY ZAHER, MOHAMED ZAHER (2009) FIELDBUS INTEROPERABILITY TESTING AND SYSTEM CONFIGURATION. Universiti Teknologi Petronas. (Unpublished)
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Electronic and Digitized Intellectual Asset
url_provider http://utpedia.utp.edu.my/
language English
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
MOHAMED ALY ZAHER, MOHAMED ZAHER
FIELDBUS INTEROPERABILITY TESTING AND SYSTEM CONFIGURATION
description This report is to discuss the research and Basic Interoperability testing for Foundation Fieldbus system, as well as the development of a control loop. Devices that use Foundation Fieldbus system cannot intemperate with devices from different manufacturers. PE1RONAS as the established company will apply Fieldbus technology in its plants. The objectives of the testing are to get a PETRONAS Technical standard on the Foundation Fieldbus system and come out with a report on the results from interoperability testing that will be the reference for system in PE1RONAS. The other objective is to test the controller performance using the three control modes, P, PI and PID. In order to achieve the objectives, first three tests should be done, basic interoperability test, Stress test and Diagnostic capability, and then a test on the controller performance will be held. Due to time constraint, UTP team was able to complete the Basic interoperability test and the control loop development. The author will only focus on testing HONEYWELL system and segment 2, provided by MTL. The Basic interoperability test was successfully done and the controller performance was successfully tested. The research about the Foundation Fieldbus should be performed continuously, to improve the system from time to time, and the analysis of results and reports will be used for future researches.
format Final Year Project
author MOHAMED ALY ZAHER, MOHAMED ZAHER
author_facet MOHAMED ALY ZAHER, MOHAMED ZAHER
author_sort MOHAMED ALY ZAHER, MOHAMED ZAHER
title FIELDBUS INTEROPERABILITY TESTING AND SYSTEM CONFIGURATION
title_short FIELDBUS INTEROPERABILITY TESTING AND SYSTEM CONFIGURATION
title_full FIELDBUS INTEROPERABILITY TESTING AND SYSTEM CONFIGURATION
title_fullStr FIELDBUS INTEROPERABILITY TESTING AND SYSTEM CONFIGURATION
title_full_unstemmed FIELDBUS INTEROPERABILITY TESTING AND SYSTEM CONFIGURATION
title_sort fieldbus interoperability testing and system configuration
publisher Universiti Teknologi Petronas
publishDate 2009
url http://utpedia.utp.edu.my/8758/1/2009%20-%20Fieldbus%20Onteroperability%20Testing%20and%20System%20Configuration.pdf
http://utpedia.utp.edu.my/8758/
_version_ 1739831601600135168
score 13.18916