PREDICTION OF TEMPERATURE PROFILE OF INJECTED CHEMICAL ALONG THE TUBULAR

During petroleum production, organic solid deposition will accumulate in the wellbore and along the tubing. Therefore, production will be reduced due to blockage of production path by organic solid deposition. To solve blockage of production path, high temperature chemical will be injected into w...

Full description

Saved in:
Bibliographic Details
Main Author: ZHI, KUEH JING
Format: Final Year Project
Language:English
Published: Universiti Teknologi Petronas 2011
Subjects:
Online Access:http://utpedia.utp.edu.my/8331/1/2011%20-%20prediction%20of%20temperature%20profile%20of%20injected%20chemical%20along%20the%20tubular.pdf
http://utpedia.utp.edu.my/8331/
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items