Design Calculation of the Upgraded Equipments for Residue Plant Under Different Operating Capacity
The increase in demand of residue due to new production of Group III Lube Base Oil Product in Melaka Refinery required the residue plant to increase the feeding capacity of residue to the required unit. For the plant to achieve the targeted flow rate of the residue, the residue plant has upgraded...
Saved in:
Main Author: | Mohd Hanafi Bin Abd Rashid @ Abd Rasip, Mohd Hanafi |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
Universiti Teknologi Petronas
2009
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/824/1/Dissertation_M_HANAFI_A_RASHID_7598.pdf http://utpedia.utp.edu.my/824/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design Calculation ofthe Upgraded Equipments for Residue Plant Under
Different Operating Capacity
by: Abd Rashid @ Abd Rasip, Mohd Hanafi
Published: (2009) -
Equipment upgrade for JPAM - Wan Junaidi
by: New Straits, Times
Published: (2013) -
Upgrading electrical equipment / Muhammad Qayyim Ahmad Kussaimi
by: Ahmad Kussaimi, Muhammad Qayyim
Published: (2021) -
Some observations in pineapple production under different fertilizer programmes and different pineapple residue management practices
by: Ahmed, Osumanu Haruna, et al.
Published: (2001) -
Classification Of Losses In Overall Equipment Effectiveness Calculation
by: A. Perumal, Puvanasvaran, et al.
Published: (2019)