Risk Based Inspection (RBI) Tool Development

The cornerstone of plant integrity is ensuring that facilities are correctly designed, and operated and maintained within the equipment design envelopes. The profitability of the facilities is significantly impacted by the cost-effectiveness of inspection and maintenance strategies and programmes...

Full description

Saved in:
Bibliographic Details
Main Author: Nur Hafizah binti Mohamad Pisol, Nur Hafizah
Format: Final Year Project
Language:English
Published: Universiti Teknologi Petronas 2009
Subjects:
Online Access:http://utpedia.utp.edu.my/598/1/nurhafizah_bt_mohamad_pisol.pdf
http://utpedia.utp.edu.my/598/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utp-utpedia.598
record_format eprints
spelling my-utp-utpedia.5982017-01-25T09:44:37Z http://utpedia.utp.edu.my/598/ Risk Based Inspection (RBI) Tool Development Nur Hafizah binti Mohamad Pisol, Nur Hafizah TP Chemical technology The cornerstone of plant integrity is ensuring that facilities are correctly designed, and operated and maintained within the equipment design envelopes. The profitability of the facilities is significantly impacted by the cost-effectiveness of inspection and maintenance strategies and programmes in place. Plant equipment is subjected to deterioration mechanisms and potential damage throughout their service life. Equipments inspection is very important in order to get the right information of the current conditions of the equipments. Risk Based approaches for managing inspection programs have emerged during the last decade as useful tools for managing risks associated with safety, health, environment and business. With quantitative RBI analysis, it is now possible to forecast inspection requirements, demonstrate the effects of inspection and facilitate the scheduling of inspection programmes. It is now widely accepted that the traditional time-based approach to planned plant inspection by competent person has a number of shortcomings. In particular, the use of fixed intervals between inspections may be too conservative and lacks the freedom to benefit from good operating experience. The introduction of goal setting legislation has facilitated a move towards risk based strategies, which focus inspection resources on parts of the plant where they will have the greatest benefit (IET, 2009). Throughout this project, RBI tool will be developed by using the provided guideline by American Petroleum Institute (API). RBI Tool frameworks for RBI qualitative risk analysis and RBI semi-quantitative risk analysis in this report are developed based on API methodology. The results from developed RBI Tool are validated by comparing them to the results of RBI from the industry. The risks between the two different RBI systems are different for the same case study. The different amount of information which is being supplied to the different RBI systems is identified as the main reason to the variation. Universiti Teknologi Petronas 2009 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/598/1/nurhafizah_bt_mohamad_pisol.pdf Nur Hafizah binti Mohamad Pisol, Nur Hafizah (2009) Risk Based Inspection (RBI) Tool Development. Universiti Teknologi Petronas, Sri Iskandar,Tronoh,Perak. (Unpublished)
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Electronic and Digitized Intellectual Asset
url_provider http://utpedia.utp.edu.my/
language English
topic TP Chemical technology
spellingShingle TP Chemical technology
Nur Hafizah binti Mohamad Pisol, Nur Hafizah
Risk Based Inspection (RBI) Tool Development
description The cornerstone of plant integrity is ensuring that facilities are correctly designed, and operated and maintained within the equipment design envelopes. The profitability of the facilities is significantly impacted by the cost-effectiveness of inspection and maintenance strategies and programmes in place. Plant equipment is subjected to deterioration mechanisms and potential damage throughout their service life. Equipments inspection is very important in order to get the right information of the current conditions of the equipments. Risk Based approaches for managing inspection programs have emerged during the last decade as useful tools for managing risks associated with safety, health, environment and business. With quantitative RBI analysis, it is now possible to forecast inspection requirements, demonstrate the effects of inspection and facilitate the scheduling of inspection programmes. It is now widely accepted that the traditional time-based approach to planned plant inspection by competent person has a number of shortcomings. In particular, the use of fixed intervals between inspections may be too conservative and lacks the freedom to benefit from good operating experience. The introduction of goal setting legislation has facilitated a move towards risk based strategies, which focus inspection resources on parts of the plant where they will have the greatest benefit (IET, 2009). Throughout this project, RBI tool will be developed by using the provided guideline by American Petroleum Institute (API). RBI Tool frameworks for RBI qualitative risk analysis and RBI semi-quantitative risk analysis in this report are developed based on API methodology. The results from developed RBI Tool are validated by comparing them to the results of RBI from the industry. The risks between the two different RBI systems are different for the same case study. The different amount of information which is being supplied to the different RBI systems is identified as the main reason to the variation.
format Final Year Project
author Nur Hafizah binti Mohamad Pisol, Nur Hafizah
author_facet Nur Hafizah binti Mohamad Pisol, Nur Hafizah
author_sort Nur Hafizah binti Mohamad Pisol, Nur Hafizah
title Risk Based Inspection (RBI) Tool Development
title_short Risk Based Inspection (RBI) Tool Development
title_full Risk Based Inspection (RBI) Tool Development
title_fullStr Risk Based Inspection (RBI) Tool Development
title_full_unstemmed Risk Based Inspection (RBI) Tool Development
title_sort risk based inspection (rbi) tool development
publisher Universiti Teknologi Petronas
publishDate 2009
url http://utpedia.utp.edu.my/598/1/nurhafizah_bt_mohamad_pisol.pdf
http://utpedia.utp.edu.my/598/
_version_ 1739830678897295360
score 13.214268