Designing a Cement Program by Using Landmark Software at HPHT Well
High-pressure, high-temperature (HPHT) wells are defined differently throughout the industry. The UK Energy Institute’s Model Code of Safe Practice in the Petroleum Industry defines HPHT wells as “where undisturbed bottomhole temperature exceeds 300°F (149°C) and where mud weight in excess of 15.4 p...
Saved in:
Main Author: | Hafizul Naim Bin Baniram, Hafizul Naim |
---|---|
Format: | Final Year Project |
Language: | English English |
Published: |
Universiti Teknologi Petronas
2012
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/5684/1/FinalReport_Hafizul%20Naim%20b%20Baniram_part01.pdf http://utpedia.utp.edu.my/5684/2/FinalReport_Hafizul%20Naim%20b%20Baniram_part02.pdf http://utpedia.utp.edu.my/5684/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A new approach for optimizing cement design to eliminate microannulus in steam injection wells
by: I., Sonny, et al.
Published: (2008) -
Well Configuration Design for Water Alternating Gas
by: Mohd Ashraf Bin Nor Azrol, Mohd Ashraf Bin Nor Azrol
Published: (2012) -
Characterization and modeling of static recovery process of brass (Copper Zinc) alloy
by: Mohamad Hafizul Hisyam, Yahya
Published: (2008) -
Assessing Reservoir Performance and Modeling using Prosper for Idle Well Reactivation
by: AHMAD FARIS HAFIZI BIN AHMAD PAUZI, AHMAD FARIS HAFIZI
Published: (2012) -
MATHEMATICAL MODELING OF HEAT TRANSFER IN MULTILATERAL WELL
by: ADIB ZULHILMI BIN MOHD ALIAS, ADIB ZULHILMI
Published: (2012)