IMPLEMENTATION OF PID CONTROLLER IN CASCADE MODE FOR TWO TANK SYSTEM

This report basically discusses the research done and basic understanding of the chosen topic, which is Implementation of PID Controller in Cascade Mode For Two Tank System. The objective of the project is to improve the efficiency of the process control on the Mobile Flowmeter Calibration Trainer t...

Full description

Saved in:
Bibliographic Details
Main Author: HAMIDON, SHARIDATUL HUSNA BINTI
Format: Final Year Project
Language:English
Published: Universiti Teknologi Petronas 2009
Subjects:
Online Access:http://utpedia.utp.edu.my/4101/1/front_page.pdf
http://utpedia.utp.edu.my/4101/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utp-utpedia.4101
record_format eprints
spelling my-utp-utpedia.41012017-01-25T09:44:11Z http://utpedia.utp.edu.my/4101/ IMPLEMENTATION OF PID CONTROLLER IN CASCADE MODE FOR TWO TANK SYSTEM HAMIDON, SHARIDATUL HUSNA BINTI TK Electrical engineering. Electronics Nuclear engineering This report basically discusses the research done and basic understanding of the chosen topic, which is Implementation of PID Controller in Cascade Mode For Two Tank System. The objective of the project is to improve the efficiency of the process control on the Mobile Flowmeter Calibration Trainer through implementation of PID controller in cascade mode. Whereas in the existing system, the controller used to control the flow of the plant is working in single mode which is less efficient. This pilot plant is equipped with three different flowmeter which are Coriolis Flowmeter, Vortex Flowmeter and Orifice Flowmeter. The Coriolis Flowmeter is used as the master flowmeter and two others flowmeter can be connected in series with master flowmeter. In addition this project will also include the installation of two channel flat bed recorder on the pilot plant. This project will begin with numerous researches either by journal references or seeking internet information that accomplished based on the project title. In order to seek out for significant information, the next action to be taken is consulting certain problem regarding to the process control with expert technician. Several experiments will also be conducted as the introduction to have basic knowledge towards the plant. The scheduled experiments are Comparative Study of different Flowmeter and Flow Control and Controller Tuning. Then, fine tuning method for optimum controller technique and MATLAB simulation will be conducted. The performance of PID controller in single mode operation and cascade control will be compared. At the end of this project it is hope that the efficiency of process control for Mobile Flowmeter Calibration Trainer can be improved. Universiti Teknologi Petronas 2009-01 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/4101/1/front_page.pdf HAMIDON, SHARIDATUL HUSNA BINTI (2009) IMPLEMENTATION OF PID CONTROLLER IN CASCADE MODE FOR TWO TANK SYSTEM. Universiti Teknologi Petronas.
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Electronic and Digitized Intellectual Asset
url_provider http://utpedia.utp.edu.my/
language English
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
HAMIDON, SHARIDATUL HUSNA BINTI
IMPLEMENTATION OF PID CONTROLLER IN CASCADE MODE FOR TWO TANK SYSTEM
description This report basically discusses the research done and basic understanding of the chosen topic, which is Implementation of PID Controller in Cascade Mode For Two Tank System. The objective of the project is to improve the efficiency of the process control on the Mobile Flowmeter Calibration Trainer through implementation of PID controller in cascade mode. Whereas in the existing system, the controller used to control the flow of the plant is working in single mode which is less efficient. This pilot plant is equipped with three different flowmeter which are Coriolis Flowmeter, Vortex Flowmeter and Orifice Flowmeter. The Coriolis Flowmeter is used as the master flowmeter and two others flowmeter can be connected in series with master flowmeter. In addition this project will also include the installation of two channel flat bed recorder on the pilot plant. This project will begin with numerous researches either by journal references or seeking internet information that accomplished based on the project title. In order to seek out for significant information, the next action to be taken is consulting certain problem regarding to the process control with expert technician. Several experiments will also be conducted as the introduction to have basic knowledge towards the plant. The scheduled experiments are Comparative Study of different Flowmeter and Flow Control and Controller Tuning. Then, fine tuning method for optimum controller technique and MATLAB simulation will be conducted. The performance of PID controller in single mode operation and cascade control will be compared. At the end of this project it is hope that the efficiency of process control for Mobile Flowmeter Calibration Trainer can be improved.
format Final Year Project
author HAMIDON, SHARIDATUL HUSNA BINTI
author_facet HAMIDON, SHARIDATUL HUSNA BINTI
author_sort HAMIDON, SHARIDATUL HUSNA BINTI
title IMPLEMENTATION OF PID CONTROLLER IN CASCADE MODE FOR TWO TANK SYSTEM
title_short IMPLEMENTATION OF PID CONTROLLER IN CASCADE MODE FOR TWO TANK SYSTEM
title_full IMPLEMENTATION OF PID CONTROLLER IN CASCADE MODE FOR TWO TANK SYSTEM
title_fullStr IMPLEMENTATION OF PID CONTROLLER IN CASCADE MODE FOR TWO TANK SYSTEM
title_full_unstemmed IMPLEMENTATION OF PID CONTROLLER IN CASCADE MODE FOR TWO TANK SYSTEM
title_sort implementation of pid controller in cascade mode for two tank system
publisher Universiti Teknologi Petronas
publishDate 2009
url http://utpedia.utp.edu.my/4101/1/front_page.pdf
http://utpedia.utp.edu.my/4101/
_version_ 1739831110597083136
score 13.159267