Comparison between Ultimate Pile Capacity of Bored Piles Determine Using Analytical method, Numerical Method and Pile Load Test At Puncak Alam, Project UiTM
The pile head settlement, bearing capacity, resistance distribution (shaft resistance and end bearing) and integrity of the bored pile obtained through several pile load tests are always different from the theoretical value. The objective of this project is to compare various method of determinin...
Saved in:
Main Author: | Wong , Chun Wah |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
2008
|
Online Access: | http://utpedia.utp.edu.my/2960/1/0001.pdf http://utpedia.utp.edu.my/2960/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Ultimate Pile Capacity of Bored Pile and Driven Pile at Ara Damansara Using
Bayesian Inverse Method
by: Justin, Calvin Jones
Published: (2010) -
Comparison between ultimate pile capacity of bored piles determine using
analytical method, numerical method and pile load test along Sentul - Batu
Caves Double Track Project
by: Ng, Jiun Heui
Published: (2008) -
Ultimate pile capacity of bored pile and drivenpile at ara damansara using bayesian inverse menthod
by: Justin, Calvin Jones
Published: (2010) -
Assessment of ultimate bearing capacity of the pile for jacking & rotary piling method
by: Hassan, Nor Syamira, et al.
Published: (2022) -
Assessment of ultimate bearing capacity of the pile for jacking & rotary piling method
by: Hassan, Nor Syamira, et al.
Published: (2023)