TARGETING FOR PROCESS HENs DESIGN AND RETROFIT IN THE CONTEXT OF TOTAL SITES

Chemical processes normally operate on total sites served by central utility systems that are complex in their operations. The utility systems supply the processes with requirements such as; process heating, process cooling, power, water supply and disposal etc. Site expansions such as introdu...

Full description

Saved in:
Bibliographic Details
Main Author: MOHAMED ADAM, ABDEL SAMED
Format: Thesis
Language:English
Published: 2012
Subjects:
Online Access:http://utpedia.utp.edu.my/21332/1/2012%20-CHEMICAL%20-%20TARGETING%20FOR%20PROCESS%20HENS%20DESIGN%20AND%20RETROFIT%20IN%20THE%20CONTEXT%20OF%20TOTAL%20SITES%20-%20ABDEL%20SAMED%20MOHAMED%20ADAM.pdf
http://utpedia.utp.edu.my/21332/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Chemical processes normally operate on total sites served by central utility systems that are complex in their operations. The utility systems supply the processes with requirements such as; process heating, process cooling, power, water supply and disposal etc. Site expansions such as introduction of new processes into existing sites, or retrofit projects such as improving the heat recovery of existing processes usually result in changes in process utility requirements. Introduction of new process into an existing site normally requires a new heat exchanger network (HEN) to be optimally designed for integration with the site. On the other hand, retrofit project in an existing site may require an existing process HEN to be retrofitted to reduce its utility consumption leading to possible debottlenecking of the process. In normal total site, a process HEN may consume and/or generate steam utilities at various pressure levels supplied from or to steam utility system through the steam mains. Thus, during the incorporation of a new process HEN or retrofitting an existing one, concurrent changes in the process steam requirement at several pressure levels may occur, causing concurrent changes in the flow of steam in the respective steam mains. Therefore, to optimize the utility systems operation and the process HENs design or retrofit, a better understanding on these interactions in the context of total site is required. In the previous approach for energy analysis and optimization of total sites, the impacts of changes in process steam requirement on the utility systems operation are assessed using steam marginal costs. For steam at a given pressure level, the marginal cost is defined as the change in the steam utility system operating cost per unit change in the steam load. The steam marginal costs are calculated based on the assumption that the changes in the process steam requirements at the various pressure levels occur successively instead of concurrently. This may not be true when real total sites are concerned. Also, steam marginal costs are known to vary with the change in the process steam flow.