UTP IMS: WEB-BASED INTERNSHIP MANAGEMENT SYSTEM
Student Industrial Internship Program (SIIP) is a program that every student needs to undergo industrial training before being allowed to graduate from Universiti Teknologi Petronas (UTP). In average, 500 students are going into the industrial world to undergo the training for every semester w...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
IRC
2019
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/20917/1/MIZA%20AIDA%20NADIA%20BINTI%20AZAHAR_22980.pdf http://utpedia.utp.edu.my/20917/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utp-utpedia.20917 |
---|---|
record_format |
eprints |
spelling |
my-utp-utpedia.209172021-09-09T20:17:49Z http://utpedia.utp.edu.my/20917/ UTP IMS: WEB-BASED INTERNSHIP MANAGEMENT SYSTEM Azahar, Miza Aida Nadia Q Science (General) Student Industrial Internship Program (SIIP) is a program that every student needs to undergo industrial training before being allowed to graduate from Universiti Teknologi Petronas (UTP). In average, 500 students are going into the industrial world to undergo the training for every semester with various companies in various places including the overseas. This dissertation is written for the development of UTP IMS: Web-Based Internship Management System for Universiti Teknologi Petronas (UTP). Most of the processes for the SIIP program in UTP are being executed manually. The aim of this project is to develop a web-based internship management system to automate and computerize the current manual processes by performing the internship registration, online-logbook submission, online reports submission, assignation of supervisors and monitoring the students’ progresses through the system. To complete this project, two phases of methodology are being use which are preliminary studies and system development. To conduct the preliminary studies, literature review of the project and interviews the stakeholders were executed. For system development, Waterfall methodology was implemented for the System Development Life Cycle (SDLC) technique and the project will be going through four phases which are Planning, Analysis, Design and, Development and Testing, and Deployment. IRC 2019-09 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/20917/1/MIZA%20AIDA%20NADIA%20BINTI%20AZAHAR_22980.pdf Azahar, Miza Aida Nadia (2019) UTP IMS: WEB-BASED INTERNSHIP MANAGEMENT SYSTEM. IRC, Universiti Teknologi PETRONAS. (Submitted) |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Electronic and Digitized Intellectual Asset |
url_provider |
http://utpedia.utp.edu.my/ |
language |
English |
topic |
Q Science (General) |
spellingShingle |
Q Science (General) Azahar, Miza Aida Nadia UTP IMS: WEB-BASED INTERNSHIP MANAGEMENT SYSTEM |
description |
Student Industrial Internship Program (SIIP) is a program that every student
needs to undergo industrial training before being allowed to graduate from Universiti
Teknologi Petronas (UTP). In average, 500 students are going into the industrial world
to undergo the training for every semester with various companies in various places
including the overseas. This dissertation is written for the development of UTP IMS:
Web-Based Internship Management System for Universiti Teknologi Petronas (UTP).
Most of the processes for the SIIP program in UTP are being executed manually. The
aim of this project is to develop a web-based internship management system to
automate and computerize the current manual processes by performing the internship
registration, online-logbook submission, online reports submission, assignation of
supervisors and monitoring the students’ progresses through the system. To complete
this project, two phases of methodology are being use which are preliminary studies
and system development. To conduct the preliminary studies, literature review of the
project and interviews the stakeholders were executed. For system development,
Waterfall methodology was implemented for the System Development Life Cycle
(SDLC) technique and the project will be going through four phases which are
Planning, Analysis, Design and, Development and Testing, and Deployment. |
format |
Final Year Project |
author |
Azahar, Miza Aida Nadia |
author_facet |
Azahar, Miza Aida Nadia |
author_sort |
Azahar, Miza Aida Nadia |
title |
UTP IMS: WEB-BASED INTERNSHIP MANAGEMENT SYSTEM |
title_short |
UTP IMS: WEB-BASED INTERNSHIP MANAGEMENT SYSTEM |
title_full |
UTP IMS: WEB-BASED INTERNSHIP MANAGEMENT SYSTEM |
title_fullStr |
UTP IMS: WEB-BASED INTERNSHIP MANAGEMENT SYSTEM |
title_full_unstemmed |
UTP IMS: WEB-BASED INTERNSHIP MANAGEMENT SYSTEM |
title_sort |
utp ims: web-based internship management system |
publisher |
IRC |
publishDate |
2019 |
url |
http://utpedia.utp.edu.my/20917/1/MIZA%20AIDA%20NADIA%20BINTI%20AZAHAR_22980.pdf http://utpedia.utp.edu.my/20917/ |
_version_ |
1739832812117164032 |
score |
13.187197 |