Investigation on Shortening of Post Closure Duration in a Hazardous Waste Landfill
Secured Landfill or Hazardous Waste landfill is an engineered structure that is fully equipped with standards regulated components necessary to prevent any waste contaminants from polluting the environment and harming human health. As the landfill reaches its service life, the landfill is require...
Saved in:
Main Author: | SAMSUDIN, NUR SHAHIRA |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
IRC
2016
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/17151/1/Final%20Dissertation%20%5BNUR%20SHAHIRA%20BINTI%20SAMSUDIN%2016321%5D.pdf http://utpedia.utp.edu.my/17151/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Closure and post-closure of landfills in Malaysia: lessons learnt
by: Fauziah, Shahul Hamid, et al.
Published: (2010) -
Post-closure of landfill: issues and policy
by: Agamuthu, Pariatamby
Published: (2006) -
EAP585 – Solid and Hazardous Waste Management
Duration : 2 hours
by: Awam, Pusat Pengajian Kejuruteraan
Published: (2022) -
Degradation of Polycyclic Aromatic Hydrocarbon from hazardous
waste landfill leachate using Photo-Fenton process
by: Saleh Hoddin, Muhamad Amirul Hafiz
Published: (2017) -
DEGRADATION OF COD AND PAHs FROM HAZARDOUS WASTE LANDFILL LEACHATE USING FENTON BASED OXIDATION PROCESSES
by: SINGA, PRADEEP KUMAR
Published: (2019)