Development of Emergency Planning and Response Model Based on OSHA Process Safety Management Requirement
When incidents happen and the consequences are not mitigated effectively, one of the indicated failures consists of ineffective emergency response planning (EPR). EPR is an important aspect of the Process Safety Management (PSM) Standards and the guidelines are stated in CFR 1910.119 (n) which ex...
Saved in:
Main Author: | MOHAMED LOQMAN, SHAHIRAH |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
IRC
2015
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/15803/1/FYPII_Jan2015_14972.pdf http://utpedia.utp.edu.my/15803/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
DEVELOPMENT OF TRADE SECRET MODEL BASED ON OSHA
PROCESS SAFETY MANAGEMENT REQUIREMENT
by: Azman, Khairul Imran
Published: (2016) -
Development of Employee Participation Model Based on OSHA Process Safety Management (PSM) Requirement
by: AZMI, SHAZWANI
Published: (2015) -
Trade secret model based on OSHA process safety management requirement
by: Majid, Noor Diana Abdul, et al.
Published: (2016) -
Ensuring emergency planning & response meet the minimum Process Safety Management (PSM) standards requirements
by: Abdul Majid, N.D., et al.
Published: (2016) -
Emergency Response Planning Prototype Based on Process Safety Management for Manufacturing Industry
by: Wan Muhaimin, Wan Petra Anisha
Published: (2014)