Countermeasure of Scour around Pier in Steady Current

The experiments on the countermeasures of scours around pier in steady current were conducted in this paper. The factor formations of scour were identified by extensive research of previous paper that related to the project. Scour formations were influence by the strength of the flow, the size of pi...

Full description

Saved in:
Bibliographic Details
Main Author: Mohamed Mokhtar, Mohamad Zulkarnain
Format: Final Year Project
Language:English
Published: IRC 2014
Subjects:
Online Access:http://utpedia.utp.edu.my/14400/1/Final%20Year%20Project%20Report.pdf
http://utpedia.utp.edu.my/14400/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utp-utpedia.14400
record_format eprints
spelling my-utp-utpedia.144002017-01-25T09:36:47Z http://utpedia.utp.edu.my/14400/ Countermeasure of Scour around Pier in Steady Current Mohamed Mokhtar, Mohamad Zulkarnain TA Engineering (General). Civil engineering (General) The experiments on the countermeasures of scours around pier in steady current were conducted in this paper. The factor formations of scour were identified by extensive research of previous paper that related to the project. Scour formations were influence by the strength of the flow, the size of pier, and the sediment condition. From the literature, the project invented a few innovative pier protection measures which are single cross-threaded pier and double-cross threaded pier with variation of cable diameter and thread angle. These cross-threaded piers also tested with collar protection. As the result, the single cross-threaded piers and double cross-threaded piers able to reduce scour in average of 18% and 21% respectively. While, single cross-threaded piers with collar and double cross-threaded piers with collar able to reduce scour in average of 69% and 63% respectively. The single cross-thread pier with collar of 0.1 cable-pier diameter ratio and 15° thread angle outperforms other models with scour reduction of 79%. That shows the cable-pier diameter ratio and thread angle influent the performance of models in scour reduction. The large number of cross-threaded pier with large cable-pier diameter ratio and small thread angle will give the best performance in reducing potential formation of scour depth. IRC 2014-09 Final Year Project NonPeerReviewed application/pdf en http://utpedia.utp.edu.my/14400/1/Final%20Year%20Project%20Report.pdf Mohamed Mokhtar, Mohamad Zulkarnain (2014) Countermeasure of Scour around Pier in Steady Current. IRC, Universiti Teknologi PETRONAS. (Unpublished)
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Electronic and Digitized Intellectual Asset
url_provider http://utpedia.utp.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Mohamed Mokhtar, Mohamad Zulkarnain
Countermeasure of Scour around Pier in Steady Current
description The experiments on the countermeasures of scours around pier in steady current were conducted in this paper. The factor formations of scour were identified by extensive research of previous paper that related to the project. Scour formations were influence by the strength of the flow, the size of pier, and the sediment condition. From the literature, the project invented a few innovative pier protection measures which are single cross-threaded pier and double-cross threaded pier with variation of cable diameter and thread angle. These cross-threaded piers also tested with collar protection. As the result, the single cross-threaded piers and double cross-threaded piers able to reduce scour in average of 18% and 21% respectively. While, single cross-threaded piers with collar and double cross-threaded piers with collar able to reduce scour in average of 69% and 63% respectively. The single cross-thread pier with collar of 0.1 cable-pier diameter ratio and 15° thread angle outperforms other models with scour reduction of 79%. That shows the cable-pier diameter ratio and thread angle influent the performance of models in scour reduction. The large number of cross-threaded pier with large cable-pier diameter ratio and small thread angle will give the best performance in reducing potential formation of scour depth.
format Final Year Project
author Mohamed Mokhtar, Mohamad Zulkarnain
author_facet Mohamed Mokhtar, Mohamad Zulkarnain
author_sort Mohamed Mokhtar, Mohamad Zulkarnain
title Countermeasure of Scour around Pier in Steady Current
title_short Countermeasure of Scour around Pier in Steady Current
title_full Countermeasure of Scour around Pier in Steady Current
title_fullStr Countermeasure of Scour around Pier in Steady Current
title_full_unstemmed Countermeasure of Scour around Pier in Steady Current
title_sort countermeasure of scour around pier in steady current
publisher IRC
publishDate 2014
url http://utpedia.utp.edu.my/14400/1/Final%20Year%20Project%20Report.pdf
http://utpedia.utp.edu.my/14400/
_version_ 1739831998592057344
score 13.160551