Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project / Dissertation / Thesis |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utar.edu.my/985/1/CSA%2D2013%2D0602020%2D1.pdf http://eprints.utar.edu.my/985/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utar-eprints.985 |
---|---|
record_format |
eprints |
spelling |
my-utar-eprints.9852015-10-21T07:43:21Z Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes Soo, Kuo Yang TE Highway engineering. Roads and pavements 2013-07 Final Year Project / Dissertation / Thesis NonPeerReviewed application/pdf http://eprints.utar.edu.my/985/1/CSA%2D2013%2D0602020%2D1.pdf Soo, Kuo Yang (2013) Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes. Master dissertation/thesis, UTAR. http://eprints.utar.edu.my/985/ |
institution |
Universiti Tunku Abdul Rahman |
building |
UTAR Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tunku Abdul Rahman |
content_source |
UTAR Institutional Repository |
url_provider |
http://eprints.utar.edu.my |
topic |
TE Highway engineering. Roads and pavements |
spellingShingle |
TE Highway engineering. Roads and pavements Soo, Kuo Yang Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes |
format |
Final Year Project / Dissertation / Thesis |
author |
Soo, Kuo Yang |
author_facet |
Soo, Kuo Yang |
author_sort |
Soo, Kuo Yang |
title |
Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
|
title_short |
Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
|
title_full |
Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
|
title_fullStr |
Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
|
title_full_unstemmed |
Solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes
|
title_sort |
solving the multi-period vehicle routing problem with time windows and delayed shipments using delay routes |
publishDate |
2013 |
url |
http://eprints.utar.edu.my/985/1/CSA%2D2013%2D0602020%2D1.pdf http://eprints.utar.edu.my/985/ |
_version_ |
1646030606889385984 |
score |
13.160551 |