Modelling of cost of mechanical & electrical services between residential & commercial building projects using selected building form descriptors : A case study of selected building projects in Abuja and Niger State,Nigeria
This research was carried out to study the problem of ineffective cost control technique in the process of formulating predictive models for cost of Mechanical and Electrical (M&E) services due to the use of inadequate information to estimate cost of M&E services during the pre-contract s...
Saved in:
Main Authors: | Shittu .A.A,, Izam .Y.D, |
---|---|
Format: | Article |
Published: |
Penerbit UKM
2011
|
Online Access: | http://journalarticle.ukm.my/3532/ http://pkukmweb.ukm.my/jsb/jbp/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A strategy for labor performance improvement for floor tiling
work in single storey buildings in Abuja, Nigeria
by: Idiake, J.E., et al.
Published: (2015) -
Cost comparison between built-in security components
and some physical characteristics of buildings in
Nigeria: Case studies of residential, commercial and
institutional buildings in Abuja and Minna
by: Anifowose .O.M,
Published: (2011) -
Improving selection practices of subcontractors on building construction project in Nigeria
by: Muhammad, Jibril Adamu
Published: (2016) -
An evaluation of ride quality in lift systems of selected public high-rise buildings in Abuja, Nigeria
by: Ibrahim, Emmanuel Chongcicimmi, et al.
Published: (2022) -
Developing the Green Building Materials Selection Criteria for Sustainable Building Projects
by: Al-Atesh, E.A., et al.
Published: (2021)