Cost performance for building construction projects in Klang Valley

Since seventies, the economic of Malaysia has undergone rapid growth. Construction industry constitutes an important element of Malaysian economy. It shows how important to control and manage the projects in good quality and efficiently. There are four fundamental constraints needed to be conside...

Full description

Saved in:
Bibliographic Details
Main Authors: A.S. Ali,, S.N. Kamaruzzaman,
Format: Article
Language:English
Published: Penerbit UKM 2010
Online Access:http://journalarticle.ukm.my/2525/1/paper07.pdf
http://journalarticle.ukm.my/2525/
http://www.ukm.my/~jsb/jbp/index.html
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-ukm.journal.2525
record_format eprints
spelling my-ukm.journal.25252016-12-14T06:31:52Z http://journalarticle.ukm.my/2525/ Cost performance for building construction projects in Klang Valley A.S. Ali, S.N. Kamaruzzaman, Since seventies, the economic of Malaysia has undergone rapid growth. Construction industry constitutes an important element of Malaysian economy. It shows how important to control and manage the projects in good quality and efficiently. There are four fundamental constraints needed to be considered when managing the construction projects, which are scope, cost, time, and quality. In order to manage the projects successfully, it is necessary to consider whether the project is within those four constraints. However, it found that there were many problems on cost performance in many countries. One of the major problems was cost overrun in construction projects. In Malaysia, the problem of cost overrun considered significance in construction industry. There were many factors that contribute to cost overrun in Malaysian construction projects. The factors might become risks and lead to negative effect to the projects. Hence, this research is to identify factors that contribute to cost overrun and potential measures to overcome the problem with the focus given to construction projects within Klang Valley. The method used in this research is quantitative based. A questionnaire survey conducted to collect data from the respondents that consisted of project manager, quantity surveyor, M & E Engineer, C & S Engineer, and other related respondents. Questionnaires were distributed to 30 respondents from construction firms in Klang Valley. Data collected form a database for analysis using Statistic Package for Social Sciences (SPSS) version 17.0. Descriptive statistics and ranking analysis were used in data analysis. The result shown that the most serious factor contributes to cost overrun was inaccurate or poor estimation of original cost and the factor do not affect most was mistake in design. The most important method to control construction cost is proper project costing and financing. On the other hand, the least important approach was establishing a system in design. In conclusion, the problem of cost overrun is not a small issue but could cause serious problems to the construction industry in Malaysia. Penerbit UKM 2010 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/2525/1/paper07.pdf A.S. Ali, and S.N. Kamaruzzaman, (2010) Cost performance for building construction projects in Klang Valley. Journal of Building Performance, 1 (1). pp. 110-118. ISSN 2180-2106 http://www.ukm.my/~jsb/jbp/index.html
institution Universiti Kebangsaan Malaysia
building Perpustakaan Tun Sri Lanang Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Kebangsaan Malaysia
content_source UKM Journal Article Repository
url_provider http://journalarticle.ukm.my/
language English
description Since seventies, the economic of Malaysia has undergone rapid growth. Construction industry constitutes an important element of Malaysian economy. It shows how important to control and manage the projects in good quality and efficiently. There are four fundamental constraints needed to be considered when managing the construction projects, which are scope, cost, time, and quality. In order to manage the projects successfully, it is necessary to consider whether the project is within those four constraints. However, it found that there were many problems on cost performance in many countries. One of the major problems was cost overrun in construction projects. In Malaysia, the problem of cost overrun considered significance in construction industry. There were many factors that contribute to cost overrun in Malaysian construction projects. The factors might become risks and lead to negative effect to the projects. Hence, this research is to identify factors that contribute to cost overrun and potential measures to overcome the problem with the focus given to construction projects within Klang Valley. The method used in this research is quantitative based. A questionnaire survey conducted to collect data from the respondents that consisted of project manager, quantity surveyor, M & E Engineer, C & S Engineer, and other related respondents. Questionnaires were distributed to 30 respondents from construction firms in Klang Valley. Data collected form a database for analysis using Statistic Package for Social Sciences (SPSS) version 17.0. Descriptive statistics and ranking analysis were used in data analysis. The result shown that the most serious factor contributes to cost overrun was inaccurate or poor estimation of original cost and the factor do not affect most was mistake in design. The most important method to control construction cost is proper project costing and financing. On the other hand, the least important approach was establishing a system in design. In conclusion, the problem of cost overrun is not a small issue but could cause serious problems to the construction industry in Malaysia.
format Article
author A.S. Ali,
S.N. Kamaruzzaman,
spellingShingle A.S. Ali,
S.N. Kamaruzzaman,
Cost performance for building construction projects in Klang Valley
author_facet A.S. Ali,
S.N. Kamaruzzaman,
author_sort A.S. Ali,
title Cost performance for building construction projects in Klang Valley
title_short Cost performance for building construction projects in Klang Valley
title_full Cost performance for building construction projects in Klang Valley
title_fullStr Cost performance for building construction projects in Klang Valley
title_full_unstemmed Cost performance for building construction projects in Klang Valley
title_sort cost performance for building construction projects in klang valley
publisher Penerbit UKM
publishDate 2010
url http://journalarticle.ukm.my/2525/1/paper07.pdf
http://journalarticle.ukm.my/2525/
http://www.ukm.my/~jsb/jbp/index.html
_version_ 1643735406399717376
score 13.211869