Investigation into the severity of factors predisposing construction projects to risks in Nigeria

Factors predisposing construction projects to risks have received extensive attention in the literature at the detriment of the level of severity. This study aims at assessing the severity of these factors in Rivers State, Nigeria, with recourse to the perceptions of construction stakeholders. In...

Full description

Saved in:
Bibliographic Details
Main Authors: Adedokun, Olufisayo Adewumi, Aje, Isaac Olaniyi, Agboola, Oladele Johnson
Format: Article
Language:English
Published: Penerbit Universiti Kebangsaan Malaysia 2019
Online Access:http://journalarticle.ukm.my/13667/1/288-1229-1-PB.pdf
http://journalarticle.ukm.my/13667/
http://spaj.ukm.my/jsb/index.php/jbp/issue/view/46
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-ukm.journal.13667
record_format eprints
spelling my-ukm.journal.136672019-11-22T21:17:22Z http://journalarticle.ukm.my/13667/ Investigation into the severity of factors predisposing construction projects to risks in Nigeria Adedokun, Olufisayo Adewumi Aje, Isaac Olaniyi Agboola, Oladele Johnson Factors predisposing construction projects to risks have received extensive attention in the literature at the detriment of the level of severity. This study aims at assessing the severity of these factors in Rivers State, Nigeria, with recourse to the perceptions of construction stakeholders. In achieving the aim; primary data were collected through questionnaires survey administered on284respondentsout of which 158 received formed the basis of analysis. The respondents were directly involved in the completed projects. Cronbach alpha test with a value of 0.902 attested to the high degree reliability of instrument used in collecting the data. Kruskal Wallis H test confirmed the convergent views of the respondents. The highly rated factors found predisposing construction projects to risks included excessive approval procedures in administrative government department/bureaucracy, inadequate contractors experience, contractor’s poor site management and supervision, inadequate programme scheduling and incomplete or inaccurate cost estimate among others. Having ascertained the significant severe factors predisposing construction projects to risk, administrative bottlenecks in securing approvals should be reduced coupled with allowance for adequate time to cater for approval formalities in government department. Also, experience of the contractor should also be given utmost priority as part of the criteria for selection to be fulfilled because it will not only enhance the project but also guide against poor site management and supervision. Lastly, there should be flexibility in the program schedule without affecting the overall project program while adequate attention should be accorded the cost estimates to ensure correctness. Penerbit Universiti Kebangsaan Malaysia 2019 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/13667/1/288-1229-1-PB.pdf Adedokun, Olufisayo Adewumi and Aje, Isaac Olaniyi and Agboola, Oladele Johnson (2019) Investigation into the severity of factors predisposing construction projects to risks in Nigeria. Journal of Building Performance, 10 (1). pp. 59-67. ISSN 2180-2106 http://spaj.ukm.my/jsb/index.php/jbp/issue/view/46
institution Universiti Kebangsaan Malaysia
building Tun Sri Lanang Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Kebangsaan Malaysia
content_source UKM Journal Article Repository
url_provider http://journalarticle.ukm.my/
language English
description Factors predisposing construction projects to risks have received extensive attention in the literature at the detriment of the level of severity. This study aims at assessing the severity of these factors in Rivers State, Nigeria, with recourse to the perceptions of construction stakeholders. In achieving the aim; primary data were collected through questionnaires survey administered on284respondentsout of which 158 received formed the basis of analysis. The respondents were directly involved in the completed projects. Cronbach alpha test with a value of 0.902 attested to the high degree reliability of instrument used in collecting the data. Kruskal Wallis H test confirmed the convergent views of the respondents. The highly rated factors found predisposing construction projects to risks included excessive approval procedures in administrative government department/bureaucracy, inadequate contractors experience, contractor’s poor site management and supervision, inadequate programme scheduling and incomplete or inaccurate cost estimate among others. Having ascertained the significant severe factors predisposing construction projects to risk, administrative bottlenecks in securing approvals should be reduced coupled with allowance for adequate time to cater for approval formalities in government department. Also, experience of the contractor should also be given utmost priority as part of the criteria for selection to be fulfilled because it will not only enhance the project but also guide against poor site management and supervision. Lastly, there should be flexibility in the program schedule without affecting the overall project program while adequate attention should be accorded the cost estimates to ensure correctness.
format Article
author Adedokun, Olufisayo Adewumi
Aje, Isaac Olaniyi
Agboola, Oladele Johnson
spellingShingle Adedokun, Olufisayo Adewumi
Aje, Isaac Olaniyi
Agboola, Oladele Johnson
Investigation into the severity of factors predisposing construction projects to risks in Nigeria
author_facet Adedokun, Olufisayo Adewumi
Aje, Isaac Olaniyi
Agboola, Oladele Johnson
author_sort Adedokun, Olufisayo Adewumi
title Investigation into the severity of factors predisposing construction projects to risks in Nigeria
title_short Investigation into the severity of factors predisposing construction projects to risks in Nigeria
title_full Investigation into the severity of factors predisposing construction projects to risks in Nigeria
title_fullStr Investigation into the severity of factors predisposing construction projects to risks in Nigeria
title_full_unstemmed Investigation into the severity of factors predisposing construction projects to risks in Nigeria
title_sort investigation into the severity of factors predisposing construction projects to risks in nigeria
publisher Penerbit Universiti Kebangsaan Malaysia
publishDate 2019
url http://journalarticle.ukm.my/13667/1/288-1229-1-PB.pdf
http://journalarticle.ukm.my/13667/
http://spaj.ukm.my/jsb/index.php/jbp/issue/view/46
_version_ 1651868047030353920
score 13.18916