Managing waste in refurbishment projects in Klang Valley

Waste has been a major problem in the construction industry. Not only waste has an impact on the efficiency of construction industry but it also causing negative impact to the environment and moreover the total project cost. There are a lot of researches on sustainable construction industry but not...

Full description

Saved in:
Bibliographic Details
Main Authors: Chai, Kok Liong, Azlan Shah Ali,
Format: Article
Language:English
Published: Penerbit Universiti Kebangsaan Malaysia 2016
Online Access:http://journalarticle.ukm.my/13282/1/155-643-1-PB.pdf
http://journalarticle.ukm.my/13282/
http://spaj.ukm.my/jsb/index.php/jbp/issue/view/33
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-ukm.journal.13282
record_format eprints
spelling my-ukm.journal.132822019-08-26T11:15:14Z http://journalarticle.ukm.my/13282/ Managing waste in refurbishment projects in Klang Valley Chai, Kok Liong Azlan Shah Ali, Waste has been a major problem in the construction industry. Not only waste has an impact on the efficiency of construction industry but it also causing negative impact to the environment and moreover the total project cost. There are a lot of researches on sustainable construction industry but not they are not related it with refurbishment project in details. Parties involve in refurbishment project encounter numerous causes of waste generation and uncertainty in managing waste. This papers aims to identify variable that contribute to waste in refurbishment projects and implementation of effective waste management in construction industry. A questionnaire survey to 172 respondents has conducted to several professions in refurbishment projects. The methodologies used are by survey. Through survey and analysis processes, all the collected data were analyzed using quantitative statistical analysis package software. The correlation tests between the dependent, intervening and independent variables would determine the relationships among of the group of variables shown in theoretical framework. Once the survey revealed waste contribution factors and the effectiveness of waste, a set of findings and recommendations are proposed for better handling waste management in refurbishment projects. The recommendation listed out and discussed will enhance the waste minimization for the construction industry and hopefully the readers of this research could find something useful information for their own ongoing or future refurbishment projects. Penerbit Universiti Kebangsaan Malaysia 2016 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/13282/1/155-643-1-PB.pdf Chai, Kok Liong and Azlan Shah Ali, (2016) Managing waste in refurbishment projects in Klang Valley. Journal of Building Performance, 7 (1). pp. 47-55. ISSN 2180-2106 http://spaj.ukm.my/jsb/index.php/jbp/issue/view/33
institution Universiti Kebangsaan Malaysia
building Perpustakaan Tun Sri Lanang Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Kebangsaan Malaysia
content_source UKM Journal Article Repository
url_provider http://journalarticle.ukm.my/
language English
description Waste has been a major problem in the construction industry. Not only waste has an impact on the efficiency of construction industry but it also causing negative impact to the environment and moreover the total project cost. There are a lot of researches on sustainable construction industry but not they are not related it with refurbishment project in details. Parties involve in refurbishment project encounter numerous causes of waste generation and uncertainty in managing waste. This papers aims to identify variable that contribute to waste in refurbishment projects and implementation of effective waste management in construction industry. A questionnaire survey to 172 respondents has conducted to several professions in refurbishment projects. The methodologies used are by survey. Through survey and analysis processes, all the collected data were analyzed using quantitative statistical analysis package software. The correlation tests between the dependent, intervening and independent variables would determine the relationships among of the group of variables shown in theoretical framework. Once the survey revealed waste contribution factors and the effectiveness of waste, a set of findings and recommendations are proposed for better handling waste management in refurbishment projects. The recommendation listed out and discussed will enhance the waste minimization for the construction industry and hopefully the readers of this research could find something useful information for their own ongoing or future refurbishment projects.
format Article
author Chai, Kok Liong
Azlan Shah Ali,
spellingShingle Chai, Kok Liong
Azlan Shah Ali,
Managing waste in refurbishment projects in Klang Valley
author_facet Chai, Kok Liong
Azlan Shah Ali,
author_sort Chai, Kok Liong
title Managing waste in refurbishment projects in Klang Valley
title_short Managing waste in refurbishment projects in Klang Valley
title_full Managing waste in refurbishment projects in Klang Valley
title_fullStr Managing waste in refurbishment projects in Klang Valley
title_full_unstemmed Managing waste in refurbishment projects in Klang Valley
title_sort managing waste in refurbishment projects in klang valley
publisher Penerbit Universiti Kebangsaan Malaysia
publishDate 2016
url http://journalarticle.ukm.my/13282/1/155-643-1-PB.pdf
http://journalarticle.ukm.my/13282/
http://spaj.ukm.my/jsb/index.php/jbp/issue/view/33
_version_ 1643739031334289408
score 13.18916