Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry

Construction dispute is found to be very common issue in the construction industry and it has bought negative impact to each participants in a construction project. Therefore, this research study was carried in order to investigate the causes, impact and dispute resolution related to the dispute in...

Full description

Saved in:
Bibliographic Details
Main Author: Kuan, Hong Wei
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.intimal.edu.my/1218/1/BQSI%201.pdf
http://eprints.intimal.edu.my/1218/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-inti-eprints.1218
record_format eprints
spelling my-inti-eprints.12182018-10-31T07:47:34Z http://eprints.intimal.edu.my/1218/ Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry Kuan, Hong Wei TA Engineering (General). Civil engineering (General) Construction dispute is found to be very common issue in the construction industry and it has bought negative impact to each participants in a construction project. Therefore, this research study was carried in order to investigate the causes, impact and dispute resolution related to the dispute in construction industry. A questionnaire survey involving 30 responses of constructed players in Malaysia the research objectives are: (1) To recognize the nature and sources of dispute in the construction industry, (2) To identify a guideline and method for avoiding and minimizing the occurrence of dispute in the construction industry, and (3) To overview the procedure of arbitration as one of the prominent dispute resolution method in Malaysia. The survey questionnaire was carried out through online questionnaire. After conducted an analysis based on the returned questionnaires, determine the main source of dispute among the 6 group of source of dispute, which are (1) Determination of agreement, (2) Payment, (3) The site and execution of work, (4) Times, (5) Negligence and nuisance, and (6) Final certificate/payment. Moreover this study also look into construction stages for dispute avoidance, which are (1) Inception stage, (2) Establishment of brief stage, (3) During the design and detailing stage, (4) preparation of tender documentation stage, (5) preparation of tender bid stage, (6) Contract award stage and (7) During the currency of contract/ execution of work stage. Lastly, the procedure of arbitration will be study.sT 2013-04-01 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/1218/1/BQSI%201.pdf Kuan, Hong Wei (2013) Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry. Other thesis, INTI INTERNATIONAL UNIVERSITY.
institution INTI International University
building INTI Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider INTI International University
content_source INTI Institutional Repository
url_provider http://eprints.intimal.edu.my
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Kuan, Hong Wei
Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry
description Construction dispute is found to be very common issue in the construction industry and it has bought negative impact to each participants in a construction project. Therefore, this research study was carried in order to investigate the causes, impact and dispute resolution related to the dispute in construction industry. A questionnaire survey involving 30 responses of constructed players in Malaysia the research objectives are: (1) To recognize the nature and sources of dispute in the construction industry, (2) To identify a guideline and method for avoiding and minimizing the occurrence of dispute in the construction industry, and (3) To overview the procedure of arbitration as one of the prominent dispute resolution method in Malaysia. The survey questionnaire was carried out through online questionnaire. After conducted an analysis based on the returned questionnaires, determine the main source of dispute among the 6 group of source of dispute, which are (1) Determination of agreement, (2) Payment, (3) The site and execution of work, (4) Times, (5) Negligence and nuisance, and (6) Final certificate/payment. Moreover this study also look into construction stages for dispute avoidance, which are (1) Inception stage, (2) Establishment of brief stage, (3) During the design and detailing stage, (4) preparation of tender documentation stage, (5) preparation of tender bid stage, (6) Contract award stage and (7) During the currency of contract/ execution of work stage. Lastly, the procedure of arbitration will be study.sT
format Thesis
author Kuan, Hong Wei
author_facet Kuan, Hong Wei
author_sort Kuan, Hong Wei
title Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry
title_short Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry
title_full Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry
title_fullStr Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry
title_full_unstemmed Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry
title_sort study of the nature, sources and avoidance of dispute and resolution in construction industry
publishDate 2013
url http://eprints.intimal.edu.my/1218/1/BQSI%201.pdf
http://eprints.intimal.edu.my/1218/
_version_ 1644541422726021120
score 13.18916