Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room

The aim of the project is Lo resolve the condensation and mould growth issues in a 24-hours air conditioned room. With the boundary conditions provided, a solution to optimize the design of insulation panel and installation method to prevent condensation and mould growth is proposed. The project...

Full description

Saved in:
Bibliographic Details
Main Authors: Cheah, Yee Hong, Gan, Chin Yeow, Hong, Ching Wah, Momin, Nor Jamiiadd
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.intimal.edu.my/117/1/BMEGI%20-%2057.pdf
http://eprints.intimal.edu.my/117/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-inti-eprints.117
record_format eprints
spelling my-inti-eprints.1172016-04-06T09:42:54Z http://eprints.intimal.edu.my/117/ Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room Cheah, Yee Hong Gan, Chin Yeow Hong, Ching Wah Momin, Nor Jamiiadd TJ Mechanical engineering and machinery The aim of the project is Lo resolve the condensation and mould growth issues in a 24-hours air conditioned room. With the boundary conditions provided, a solution to optimize the design of insulation panel and installation method to prevent condensation and mould growth is proposed. The project started by conducting case studies to identify the root of condensation and mould growth problems as well as the critical areas where the condensation most likely to occur. The fundamental knowledge of heat transfer, thermodynamics and relevant topics are applied to interpret the heat transfer operation inside and outside of the air conditioned room. A comprehensive study on the available insulation materials in the market is conducted. By comparing each material’s specification, Polyurethane is the selected due to its excellent strength-to-weight ratio, insulation properties, durability and flexibility which provide effective solution for this project. Moreover, heat transfer formulas are employed Lo determine the wall surface temperatures, dew point temperature and optimum insulation thickness. At the same time, the room condition is simulated using Solidworks FIoEFD and Ansys Fluent software. Based on calculations, there will be condensation problem due to the outer wall temperature is lower than the dew point temperature and this is further validated with the simulated results. After analyzing the calculated results, it shows that required insulation thickness must be more than 55.52 millimeter to eliminate condensation. These parameters are then input into simulation and the simulated results show that the condensations stop which matched the calculated results. According to the insulation guideline, a safety factor of 1.5 is considered to ensure that the insulation panel is safe and will not fail when degrade over time. Hence, the actual thickness of the Polyurethane panel proposed is 83.28 millimeter. The proposed installation method is a combination of foam spraying and foam injection method. For wall insulation, foam injection method is used to ensure seamless insulation; for roof and floor insulation, foam spraying method is selected due to these areas are hard to reach. 2015 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/117/1/BMEGI%20-%2057.pdf Cheah, Yee Hong and Gan, Chin Yeow and Hong, Ching Wah and Momin, Nor Jamiiadd (2015) Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room. Other thesis, INTI International University.
institution INTI International University
building INTI Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider INTI International University
content_source INTI Institutional Repository
url_provider http://eprints.intimal.edu.my
language English
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Cheah, Yee Hong
Gan, Chin Yeow
Hong, Ching Wah
Momin, Nor Jamiiadd
Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room
description The aim of the project is Lo resolve the condensation and mould growth issues in a 24-hours air conditioned room. With the boundary conditions provided, a solution to optimize the design of insulation panel and installation method to prevent condensation and mould growth is proposed. The project started by conducting case studies to identify the root of condensation and mould growth problems as well as the critical areas where the condensation most likely to occur. The fundamental knowledge of heat transfer, thermodynamics and relevant topics are applied to interpret the heat transfer operation inside and outside of the air conditioned room. A comprehensive study on the available insulation materials in the market is conducted. By comparing each material’s specification, Polyurethane is the selected due to its excellent strength-to-weight ratio, insulation properties, durability and flexibility which provide effective solution for this project. Moreover, heat transfer formulas are employed Lo determine the wall surface temperatures, dew point temperature and optimum insulation thickness. At the same time, the room condition is simulated using Solidworks FIoEFD and Ansys Fluent software. Based on calculations, there will be condensation problem due to the outer wall temperature is lower than the dew point temperature and this is further validated with the simulated results. After analyzing the calculated results, it shows that required insulation thickness must be more than 55.52 millimeter to eliminate condensation. These parameters are then input into simulation and the simulated results show that the condensations stop which matched the calculated results. According to the insulation guideline, a safety factor of 1.5 is considered to ensure that the insulation panel is safe and will not fail when degrade over time. Hence, the actual thickness of the Polyurethane panel proposed is 83.28 millimeter. The proposed installation method is a combination of foam spraying and foam injection method. For wall insulation, foam injection method is used to ensure seamless insulation; for roof and floor insulation, foam spraying method is selected due to these areas are hard to reach.
format Thesis
author Cheah, Yee Hong
Gan, Chin Yeow
Hong, Ching Wah
Momin, Nor Jamiiadd
author_facet Cheah, Yee Hong
Gan, Chin Yeow
Hong, Ching Wah
Momin, Nor Jamiiadd
author_sort Cheah, Yee Hong
title Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room
title_short Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room
title_full Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room
title_fullStr Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room
title_full_unstemmed Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room
title_sort resolution to walls surfaces condensation & mould growth issue in an 24-hours air conditioned room
publishDate 2015
url http://eprints.intimal.edu.my/117/1/BMEGI%20-%2057.pdf
http://eprints.intimal.edu.my/117/
_version_ 1644541098803068928