CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | en en en |
| Published: |
2024
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/12650/1/YAP%20WAN%20HEONG%2024p.pdf http://eprints.uthm.edu.my/12650/2/Declaration.pdf http://eprints.uthm.edu.my/12650/3/YAP%20WAN%20HEONG%20full.pdf http://eprints.uthm.edu.my/12650/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
